Welcome To The Metanor Resources HUB On AGORACOM

Metanor (MTO-V) is a new Canadian Gold Producer located in Quebec. It reached commercial production on December 1, 2013 and will produce 50,000 oz in calender 2014 with a present all-in cash cost of $1,018US.

Free
Message: Bachelor Lake Mine Re-opened

Bachelor Lake Mine Re-opened

posted on Nov 17, 2009 10:34AM

November 17, 2009
METANOR REOPENS UNDERGROUND MINE AT BACHELOR LAKE

November 17, 2009 - Val-d'Or, Quebec, Canada: Metanor Resources Inc. (MTO: TSX-V) announces that Inspector Mr. Gaétan Gagnon of the CSST(Commission de la Sante et de la Securite du Travail), assisted by Mr. Mario St-Pierre, released his decision on the resumption of work at the Bachelor mine this Monday the 16th of November 2009, at 3.30 pm and his intervention report reads as follows: ' under the powers granted to me by the CSST, article 189, I authorize the resumption of work in the Bachelor underground shaft located at 200 Chemin de la Mine, Desmaraisville. '

Further, Metanor would like to mention that the operations, both at the Barry open pit and the Bachelor Lake Mill were never halted and are continuing.

Share
New Message
Please login to post a reply