![]()
![]()
![]()
September 24, 2009
Metanor Resources Inc. announce new results of the drilling campaign currently underway on the Barry property, located in Quebec, Canada, which continues to extend mineralized zones of the Main Zone and the Center Zone located between Zone 43 and the West Zone. Diamond Drill Hole MB-09-423 was drilled on section 825 E and has intersected close to the surface 9.24 g/t over 33m, including an intersection of 13.38 g/t over 22.5m. This gold intersection was obtained between 4.5 m and 37.5 m along the drill hole and shows the lateral continuity of the Center Zone and its gold bearing content between the West Zone and Zone 43. Diamond Drill Hole MB-09-421 was drilled on section 790 E and intersected mineralization of the Main Zone between 83m and 106.25m along the drill hole, and returned an intersection of 3.85 g/t over 23.25m, including 7.17 g/t over 10.2m. This gold intersection obtained to a vertical depth of approximately 65 to 85m indicates the continuity at depth of the Main Zone.
Further details at: