Ni, Co, Cu, PGM, Au Properties in Ontario Canada

Producing Mines and "state-of-the-art" Mill

Free
Message: McAra - a little Due Dilligence

McAra - a little Due Dilligence

posted on Jan 25, 2010 02:09PM

McAra Due Dilligence

Hole#

From

To

Interval

Ag(g/t)

As(%)

Co(%)

Cu(%)

Ni(%)

Source

Year

WM-2

23.8

24.3

0.5

41.2

21.42

10.03

.04

1.17

Ni43-101

1998

WM-2

27.2

27.7

0.5

30.3

20.84

9.44

.02

1.14

Ni43-101

1998

WM-3

67.5

68.4

0.9

8.8

6.38

4.23

0

0.39

Ni43-101

wM-3

79.2

79.8

0.6

82.5

21.15

13.36

0.09

1.68

Ni43-101

WM-10

28.6

28.9

0.3

609

10.23

5.89

0.67

0.33

Ni43-101

DDH E-2

47

48.5

1.5

9.2

0.18

0.9

0.01

Ni43-101

2003

DDH E-2

48.5

49

0.5

50

7.33

0.09

0.13

Ni43-101

DDH E-2

49

50

1

37.6

0.04

4.81

0.02

Ni43-101

DDH E-2

50

50.5

0.5

30.2

0.01

3.83

0.13

Ni43-101

DDH E-2

3.5

26.14

1.14

2.32

0.09

Ni43-101

EDS-04-4

27.65

28.35

0.7

4.1

4.2

0.37

25-Feb-04

2004

EDS-04-5

41

43.5

2.5

22.1

4.77

0.393

0.343

25-Feb-04

EDS-04-5

42

43

1

40.25

10.26

0.013

0.8

25-Feb-04

EDS-04-6

28.7

29.2

0.5

3.1

2.48

0.294

25-Feb-04

EDS-04-6

41.2

42

0.8

0.6

1.03

0.069

25-Feb-04

EDS-04-07

50.3

54.77

4.47

10.29

3.34

0.32

1-Oct-04

50.7

51

0.3

10.38

0.81

1-Oct-04

2004

52.5

52.95

0.45

22.4

11.74

0.91

1-Oct-04

2004

0.47

18

6.54

1.01

1-Oct-04

2004

EDS-04-08

65

65.6

0.6

25

4.07

0.38

1-Oct-04

2004

67.5

68

0.5

11.4

6.48

0.5

1-Oct-04

2004

EDS-04-09

84

85.5

1.5

3.2

0.65

0.34

0.041

1-Oct-04

2004

97

99

2

8.15

0.27

0.42

1-Oct-04

2004

81

88.5

7.5

8.1

0.15

1.31

0.02

1-Oct-04

2004

85.5

87

1.5

20.9

0.032

3.58

0.01

1-Oct-04

2004

EDS-04-11

74.62

76.5

1.88

6.49

3.11

0.22

1-Oct-04

2004

74.62

75.4

0.78

13.8

7.26

0.48

1-Oct-04

2004

EDS-04-12

86

89

3

12

1.66

0.11

1-Oct-04

2004

87

88

1

20.6

4.04

0.25

1-Oct-04

2004

EDS-04-16

46.6

47.1

0.5

5.73

0.26

1-Oct-04

2004

Bulk Sample

362 kgs of veined material from exposed length of 12 metres

crushing o 1 inch

Sample Number

Co (%)

Ni (%)

Ag (g/t)

97951

9.92

1.16

19.2

97952

10.67

1.24

18.4

97953

9.74

1.11

19.7

97954

10.29

1.09

18.5

97955

10.32

1.09

19.3

97956

10.19

1.14

18.9

Avg

10.18

1.14

19

2004 spot price $22.45 lb

The cobalt system has been defined by drilling over a strike length of 135m to 65m depth and is open along

strike and at depth.

Liberty also staked two additional contiguous claims to this claim group to link a block of 18 contiguous claims

in Ray township. The Ray claim block extends north into Leith township and covers an area approx 4km x 12 km.

There are several surface showings of Cobalt mineralizaton on the new claims. One pit was sampled and

Returned 0.21% - 0.418% Cobalt and 0.189% - 0.39% Nickel over 5 samples with an average grade of

0.2888% Cobalt and 0.205% Ni (Sep 26, 2005)

Share
New Message
Please login to post a reply