Wanderer5, not sure for ni, but for gold to be moved up from inferred to indicated, ..
Vertical extensions up to 50 feet above and below
Indicated Resource
Maximum vertical extensions of 50 feet beyond measured
Inferred Resource
Maximum vertical and strike extensions of 75 feet to
blocks. Up to 50 feet along strike and 75 feet vertical projection from drill hole
information.
development and/or stoping. No strike extensions to open ground are included.
Measured Resource