Decision on Instrument:
Permit To Take Water issued September 28, 2007, as follows:
SOURCE # 1
Source of Water: Redstone River
Purpose of Taking: Industrial
Period of Water Taking: Year-round
Amount of Taking:
Redstone River:
Maximum rate per minute (Litres): 623
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 897,100
Maximum number of days of taking per year: 365
SOURCE # 2
Source of Water: Redstone Mine Ramp (Spring Freshet)
Purpose of Taking: Industrial
Amount of Taking:
Maximum rate per minute (Litres): 694
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 1,000,000
Maximum number of days of taking per year: 90
Source of Water: Redstone Mine Ramp (Operational)
Purpose of Taking: Industrial
Amount of Taking:
Maximum rate per minute (Litres): 347
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 500,000
Maximum number of days of taking per year: 275
SOURCE # 3
Source Water: Redstone Mine Shaft (Spring Freshet)
Purpose of Taking: Industrial
Amount of Taking:
Maximum rate per minute (Litres): 694
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 1,000,000
Maximum number of days of taking per year: 90
Source of Water: Redstone Mine Shaft (Operational)
Purpose of Taking: Industrial
Amount of Taking:
Maximum rate per minute (Litres): 347
Maximum number of hours of taking per day: 24
Maximum volume per day (Litres): 500,000
Maximum number days taken per year: 275
Length of Permit: 10 years
Comment(s) Received on the Proposal: 0
Public Consultation on the proposal for this decision was provided for 30 Days, from April 25, 2007 to May 25, 2007.
As a result of public consultation on the proposal, the Ministry received a total of 0 comments.
Leave to Appeal Provisions:
Any resident of Ontario may seek leave to appeal this decision, by serving written Notice, within 15 days of February 27, 2009 upon the following:
Environmental Commissioner of Ontario:
Environmental Commissioner of Ontario 1075 Bay Street Suite 605 Toronto Ontario M5S 2B1 Phone: (800) 701-6454
Issuing Authority:
David Hollinger Supervisor, Water Resources Technical Support Section 435 James Street South Floor 3 Thunder Bay Ontario P7E 6S7 Phone: (807) 475-1711
Proponent:
Liberty Mines Inc. Redstone Mine Langmuir Road Eldorado Township Ontario Canada P0N 1H0
Appellate Body:
Secretary Environmental Review Tribunal 655 Bay Street Floor 15 Toronto M5G 1E5 Phone: (416) 314-4600 Fax: (416) 314-4506
The Notice must be signed and dated and include all of the following information: 1. The EBR Registry Number, the Ministry Reference Number, the Proponent's name and address to whom the instrument was issued and the location of Activity. (All available from this Registry posting) 2. A copy of any comments that were submitted on the original proposal, if comments were not submitted, an explanation of your interest in seeking leave to appeal the decision is required. 3. A description of the grounds for the application for leave to appeal including information that demonstrates that: (a) there is a good reason to believe that no reasonable person, having regard to the relevant law and any government policies developed to guide decisions of that kind, could have made the decision; and (b) the decision in respect of which an appeal is sought could result in significant harm to the environment. 4. The portion of the instrument or each term or condition in the instrument in respect of which the leave to appeal is applied for. 5. The grounds on which you intend to reply at the hearing, in the event that the leave to appeal is granted, in relation to each portion that you are seeking leave to appeal.
|
|
Contact:
Jacinth Gilliam-Price Permit To Take Water Evaluator Ministry of the Environment Operations Division Northern Regional Office Technical Support Section 435 James Street South Floor 3 Thunder Bay Ontario P7E 6S7 Phone: (807) 475-1734 Fax: (807) 475-1754
Location(s) Related to this Instrument:
Redstone Mine - Redstone River Intake Address: Redstone Mine Eldorado Geo. Twp., Concession: , Plan: , Timmins, City, District of Cochrane District Office: Timmins
GeoReference: Map Datum: NAD83, Zone: 17, Accuracy Estimate: 10-30 metres eg. Medium Quality GPS, Method: GPS, UTM Easting: 487723, UTM Northing: 5351620, , Redstone Mine Ramp
Address: Redstone Mine Eldorado Geo. Twp., Concession: , Plan: , Timmins, City, District of Cochrane District Office: Timmins
GeoReference: Map Datum: Unknown, Zone: 17, Accuracy Estimate: 1-10 metres eg. Good Quality GPS, Method: Not Available, UTM Easting: 488214, UTM Northing: 5351514, Redstone Mine Shaft
Address: Redstone Mine Eldorado Geo. Twp., Concession: , Plan: , Timmins, City, District of Cochrane District Office: Timmins
GeoReference: Map Datum: Unknown, Zone: 17, Accuracy Estimate: 1-10 metres eg. Good Quality GPS, Method: Not Available, UTM Easting: 487980, UTM Northing: 5351184,
ELDORADO
Additional Information:
The following government offices have additional information regarding this Decision. To arrange a viewing of these documents please call the Ministry Contact or the Office listed below.
Northern Regional Office 435 James Street South Floor 3 Suite 331 Thunder Bay Ontario P7E 6S7 Phone: (807) 475-1205
The documents linked below are provided for the purposes of enhancing public consultation. All links will open in a new window
1. Permit To Take Water (PTTW)
|