posted on
Aug 21, 2008 07:05AM

Ni, Co, Cu, PGM, Au Properties in Ontario Canada
Producing Mines and "state-of-the-art" Mill

Message: Re: LBE
Buxom
(p82) Table 16-4 gives you the resource.
p 83 Table 16-5 Grade sensitivity tables
p 87 three levels to be mined
1) 65m level
2)100m level
3)135m level
read pp 86 - 88 sections 17.1.16 & 17
Very important:
Section 17.2 pp93-94
Table 17-2 and Table 17-3
Mining costs are pp 93-94 but look at last nr for latest costs
page 100 table 17.7
In one of my notes I took the Total figure $58.97 / 20 = 2.9485 per lb
I also used $58.97 / 14 = 4.21 per lb
average operating cost will be $2.52 per lb. The total cost per lb after smelting is $5.56
average grade 0.93% ni
20 lbs of Ni er tonne of ore $89.00 (Table 17-8 p 101) / 20 = $4.50 per lb
**********
If you go back to July 07, 2008 6:10pm we spent the weekend working through it at $9.00. Hope this helps. Ican't work things out until this evening.
Just below it is total costs
1 Recommendations
Loading...
Loading...
New Message
Please
login
to post a reply