Drilling Highlights Extend the Mineralized Zone to Over 1 Km in Length:
Drill Hole
|
From (m)
|
To (m)
|
Interval (m)
|
Silver (g/t)
|
Lead (%)
|
Zinc (%)
|
Silver (eqv*)
|
PC-020-11
|
3.0
|
10.5
|
7.5
|
145.4
|
0.211
|
0.305
|
167.4
|
PC-020-11
|
39.0
|
48.0
|
9.0
|
264.7
|
0.398
|
0.594
|
307.1
|
PC-023-11
|
28.5
|
31.5
|
3.0
|
205.5
|
0.759
|
0.817
|
273.1
|
PC-024-11
|
183.0
|
189.0
|
6.0
|
63.8
|
0.232
|
0.409
|
91.0
|
including
|
174.0
|
177.0
|
3.0
|
157.0
|
0.509
|
0.585
|
203.9
|
including
|
193.5
|
195.0
|
1.5
|
190.0
|
0.625
|
0.406
|
234.6
|
PC-028-11
|
132.0
|
183.0
|
51.0
|
91.3
|
0.928
|
2.514
|
237.0
|
including
|
133.5
|
151.5
|
18.0
|
188.0
|
2.256
|
5.726
|
526.2
|
*Prices used to calculate silver eqv.: Ag $15/oz; Zn $.91/lb; Pb $.97 lb
http://www.kootenaygold.ca/s/NewsReleases.asp?ReportID=450164&_Type=News-Releases&_Title=Kootenay-Drills-237-gpt-Silver-eqv-over-51m-Including-526.2-gpt-Silver-over...