Kirkland Lake Gold Inc.

KGI is an operating and exploration gold Company in Kirkland Lake, Ontario which is located in the Lower Abitibi Greenstone belt in northeastern Ontario.

Free
Message: South Mine Complex Extended Further East
November 5, 2012
South Mine Complex Extended Further East; Drill Hole 53-2111A Assays 2.97 Ounces of Gold Per Ton Over 10.0 Feet True Width
KIRKLAND LAKE, ONTARIO--(Marketwire - Nov. 5, 2012) - Kirkland Lake Gold Inc. (the Company) (TSX:KGI)(AIM:KGI), an operating and exploration gold company, is pleased to announce drilling results from recently completed underground diamond drilling exploration program. This particular program includes further drilling on the HM property which was formerly held under a joint venture with Queenston Mining Inc. but which was acquired, along with the South Claims, North Amalgamated and other joint venture properties, from Queenston on August 30, 2012.

This most recent round of drilling on the HM claim and the adjoining west Macassa claim has served to extend the South Mine Complex to its furthest point east to date. (see figure 1)

The following are some of the highlights of the new exploration programs:

--  Drill hole 53-2111A returned 2.97 ounces of gold per ton (opt) (uncut)
    or 1.61 opt cut over a true width of 10.0 feet. This intersection has
    extended the New South Zone an additional 220 feet east from previously
    reported drill hole 53-1797 (8.55 opt uncut) or 3.5 opt cut over a true
    width of 0.9 feet. (see the Company's news release dated November 15,
    2011). This is the furthest east intersection to date on the South Mine
    Complex bringing the total strike length to date of the SMC to
    approximately 3,500 feet. 

--  Drill holes 53-1978 and 53-1979 tested an inferred resource area of the
    New South Zone. Both of these drill holes returned high grade gold
    mineralization including 4.64 opt (uncut) or 2.34 opt cut over a true
    width of 17.5 feet (53-1978) and 3.45 opt (uncut) or 2.73 opt cut over a
    true width of 5.3 feet (53-1979). (see figure 2) 

--  Drill hole 53-1980 successfully tested potential footwall mineralization
    with three footwall zones intersected including 0.26 opt over a true
    width of 5.4 feet, a second zone assaying 2.12 opt (uncut) or 1.98 opt
    cut over a true width of 4.2 feet, and a third zone assaying 3.06 opt
    over a core length of 1.0 feet.
"Drill hole 53-2111A confirms that the South Mine Complex continues east with strong mineralization and remains open in that direction." said Stewart Carmichael, Exploration Manager. "This latest round of drilling has also intersected a number of narrower zones, though with still significant mineralization in both the hanging wall and footwall to the New South Zone which will be further tested over the next year," added Mr. Carmichael.

Mr. Harry Dobson, Chairman commented, "The high-grade results over larger widths confirm our strategic thinking in acquiring 100% interest in these claims. Underground development is in place to both continue drilling on the HM and South Claims, and connect the eastern extension of the SMC to our trackless haulage ramp."

--  Development is now proceeding on schedule with the 5300 level
    exploration drift now extended 100 feet east along the HM-North
    Amalgamated claim boundary. A large drill bay will be excavated 320 feet
    further along this drift which will enable the Company to fully explore
    the potential extension of the SMC to the east. This drift will continue
    eastward through the Kirkland Minerals, Teck Hughes and eventually the
    Lakeshore property, providing and excellent platform for exploration
    drilling to test for SMC style mineralization as well as other potential
    mineralized systems associated with the Main and South Breaks.
The following figure, referred to elsewhere in this release, may be viewed at the Company's website at www.klgold.com.

--  Figure 1 - general plan view showing the location of the latest drilling
    results detailed in this release. 
--  Figure 2 - detailed plan view showing the latest drilling results from
    the underground drill program on the HM and Macassa claim.
The following tables summarize the latest drilling results in imperial values:

5300 LEVEL EXPLORATION                                                      
                                                                            
----------------------------------------------------------------------------
                                       HOLE                                 
DRILL                FROM      TO       DIP  AZIMUTH                   ASSAY
HOLE No.     ZONE  (feet)  (feet) (degrees)(degrees)       (oz per ton/feet)
----------------------------------------------------------------------------
53-2111A  Hanging   666.5   670.5       -42      015     0.29/4.0' CL=??' TW
             Wall                                                           
                                                                            
        New South   686.1   700.0                    2.97/13.9' CL=10.0' TW,
                                                                       Uncut
                                                     1.61/13.9' CL=10.0' TW,
                                                                      Cut(i)
            Incl.   686.1   687.5                     20.66/1.4' CL=1.0' TW,
                                                                    Vg, Tell
              and   691.4   692.8                      5.71/1.4' CL=1.0' TW,
                                                                    VG, Tell
              and   695.9   697.4                       1.51/1.5' CL=1.1' TW
----------------------------------------------------------------------------
53-1978   Hanging   529.0   533.5       -58      359    1.06/4.5' CL=3.7' TW
             Wall                                                           
                                                                            
          Hanging   593.5   595.0                   0.58/1.5' CL=??' TW, VG,
             Wall                                                       Tell
        New South   615.5   636.4                    4.64/20.9' CL=17.5' TW,
                                                                       Uncut
                                                     2.34/20.9' CL=17.5' TW,
                                                                      Cut(i)
            Incl.   615.5   617.2                      9.53/1.7' CL=1.4' TW,
                                                                    VG, Tell
              and   617.2   619.2                     13.58/2.0' CL=1.7' TW,
                                                                    VG, Tell
              and   632.3   634.4                     22.17/2.1' CL=1.8' TW,
                                                                    VG, Tell
         Footwall   737.5   738.5                    0.89/1.0' CL=??' TW, VG
         Footwall   750.5   751.5                      3.10/1.0' CL=0.9' TW,
                                                                    VG, Tell
         Footwall 1,154.4 1,155.8                        0.27/1.4' CL=??' TW
----------------------------------------------------------------------------
53-1979   Hanging   513.0   514.5       -67      356     0.21/1.5' CL=??' TW
             Wall                                                           
                                                                            
          Hanging   523.0   526.7                        0.70/3.7' CL=??' TW
             Wall                                                           
            Incl.   525.5   526.7                    1.81/1.2' CL=??' TW, VG
        New South   552.0   558.0                      3.45/6.0' CL=5.3' TW,
                                                                       Uncut
                                                       2.73/6.0' CL=5.3' TW,
                                                                      Cut(i)
            Incl.   553.0   554.5                       2.23/1.5' CL=1.3' TW
              and   556.5   558.0                     10.09/1.5' CL=1.3' TW,
                                                                          VG
----------------------------------------------------------------------------
53-1980 New South   642.7   644.7       -45      344    0.02/2.0' CL= TW Not
                                                                  Calculated
                                                                            
         Footwall   799.7   805.5                       0.26/5.8' CL=5.4' TW
         Footwall   967.5   972.0                      2.12/4.5' CL=4.2' TW,
                                                                       Uncut
                                                       1.98/4.5' CL=4.2' TW,
                                                                     Cut(ii)
            Incl.   970.0   972.0                   3.80/2.0' CL=1.9' TW, VG
         Footwall   986.0   987.0                       3.06/1.0' CL=??' TW,
                                                                        Tell
----------------------------------------------------------------------------
53-2108 New South   506.6   515.7       -70      042    0.28/9.1' CL=8.7' TW
                                                                            
            Incl.   511.6   512.6                   1.62/1.0' CL=1.0' TW, VG
         Footwall   710.4   712.4                        0.20/2.0' CL=??' TW
         Footwall 1,049.6 1,050.8                        0.62/1.2' CL=??' TW
         Footwall 1,065.8 1,066.8                        1.85/1.0' CL=??' TW
----------------------------------------------------------------------------
53-2109   Hanging   566.6   568.6       -55      025   6.79/2.0' CL=1.6' TW,
             Wall                                                      Uncut
                                                                            
                                                        1.96/2.0' CL=??' TW,
                                                                     Cut(ii)
            Incl.   566.6   567.6                      13.16/1.0' CL=??' TW,
                                                                    VG, Tell
        New South   596.7   607.4                      0.53/10.7' CL=8.9' TW
            Incl.   606.2   607.4                   3.02/1.2' CL=1.0' TW, VG
         Footwall   627.3   628.4                    1.47/1.1' CL=??' TW, VG
         Footwall   867.2   869.1                   1.34/1.9' CL=1.6' TW, VG
----------------------------------------------------------------------------
53-2110   Hanging   354.6   356.1       -80      042 0.89/1.5' CL=??' TW, VG
             Wall                                                           
                                                                            
        New South   504.0   524.2                       0.03/20.2' CL=TW Not
                                                                  Calculated
         Footwall   637.5   638.5                        0.40/1.0' CL=??' TW
----------------------------------------------------------------------------
TW = True Width, CL = Core Length, VG = Visible Gold, Tell = Tellurides,    
 (i)Cut = cut to 7.2 opt, (ii)Cut=cut to 3.5 opt.,?? TW = True Width Unknown
The following tables summarize the latest drilling results in metric values:

5300 LEVEL EXPLORATION                                                      
                                                                            
----------------------------------------------------------------------------
                                   HOLE                                     
DRILL              FROM    TO       DIP   AZIMUTH                      ASSAY
HOLE No.     ZONE   (m)   (m) (degrees) (degrees)        (grams per tonne/m)
----------------------------------------------------------------------------
53-2111A  Hanging 203.1 204.4       -42       015        9.94/1.3m CL=??m TW
             Wall                                                           
                                                                            
              New 209.1 213.4                        101.83/4.3m CL=3.0m TW,
            South                                                      Uncut
                                                      55.20/4.3m CL=3.0m TW,
                                                                      Cut(i)
            Incl. 209.1 209.6                    708.35/0.5m CL=0.3m TW, Vg,
                                                                        Tell
              and 210.7 211.2                    195.77/0.5m CL=0.3m TW, VG,
                                                                        Tell
              and 212.1 212.6                          51.77/0.5m CL=0.3m TW
----------------------------------------------------------------------------
53-1978   Hanging 161.2 162.6       -58       359      36.34/1.4m CL=1.1m TW
             Wall                                                           
                                                                            
          Hanging 180.9 181.4                      19.89/0.5m CL-??m TW, VG,
             Wall                                                       Tell
              New 187.6 194.0                        159.09/6.4m CL=5.3m TW,
            South                                                      Uncut
                                                      80.23/6.4m CL=5.3m TW,
                                                                      Cut(i)
            Incl. 187.6 188.1                    326.75/0.5m CL=0.4m TW, VG,
                                                                        Tell
              and 188.1 188.7                    465.60/0.6m CL=0.5m TW, VG,
                                                                        Tell
              and 192.7 193.4                    760.12/0.7m CL=0.5m TW, VG,
                                                                        Tell
         Footwall 224.8 225.1                       30.51/0.3m CL=??m TW, VG
                                                                            
         Footwall 228.8 229.1                    106.29/0.3m CL=0.3m TW, VG,
                                                                        Tell
         Footwall 351.9 352.3                            9.26/0.4m CL=??m TW
----------------------------------------------------------------------------
53-1979   Hanging 156.4 156.8       -67       356         7.2/0.4m CL=??m TW
             Wall                                                           
                                                                            
          Hanging 159.4 160.5                           24.00/1.1m CL=??m TW
             Wall                                                           
            Incl. 160.2 160.5                       62.06/0.3m CL=??m TW, VG
                                                                            
              New 168.2 170.1                        118.29/1.9m CL=1.6m TW,
            South                                                      Uncut
                                                      93.60/1.9m CL=1.6m TW,
                                                                      Cut(i)
            Incl. 168.6 169.0                          76.46/0.4m CL=0.4m TW
                                                                            
              and 169.6 170.1                     345.95/0.4m CL=0.4m TW, VG
----------------------------------------------------------------------------
53-1980       New 195.9 196.5       -45       344       0.07/0.6m CL= TW Not
            South                                                 Calculated
                                                                            
         Footwall 243.7 245.5                           8.91/1.8m CL=1.6m TW
                                                                            
         Footwall 294.9 296.3                         72.69/1.4m CL=1.3m TW,
                                                                       Uncut
                                                      67.89/1.4m CL=1.3m TW,
                                                                     Cut(ii)
            Incl. 295.6 296.3                     130.29/0.7m CL=0.6m TW, VG
                                                                            
         Footwall 300.5 300.8                    104.92/0.3m CL=??m TW, Tell
----------------------------------------------------------------------------
53-2108       New 154.4 157.2       -70       042       9.60/2.8m CL=2.7m TW
            South                                                           
                                                                            
            Incl. 155.9 156.2                      55.54/0.3m CL=0.3m TW, VG
                                                                            
         Footwall 216.5 217.1                            6.86/0.6m CL=??m TW
                                                                            
         Footwall 319.9 320.3                           21.26/0.4m CL=??m TW
                                                                            
         Footwall 324.9 325.2                           63.43/0.3m CL=??m TW
----------------------------------------------------------------------------
53-2109   Hanging 172.7 173.3       -55       025     232.8/0.6m CL=0.5m TW,
             Wall                                                      Uncut
                                                                            
                                                       67.20/0.6m CL=??m TW,
                                                                     Cut(ii)
            Incl. 172.7 173.0                     451.20/0.3m CL=??m TW, VG,
                                                                        Tell
              New 181.9 185.1                          18.17/3.2m CL=2.7m TW
            South                                                           
            Incl. 184.8 185.1                     103.54/0.3m CL=0.3m TW, VG
                                                                            
         Footwall 191.2 191.5                       50.40/0.3m CL=??m TW, VG
                                                                            
         Footwall 203.4 203.9                      45.94/0.5m CL=0.5m TW, VG
----------------------------------------------------------------------------
53-2110   Hanging 108.1 108.5       -80       042   30.51/0.4m CL=??m TW, VG
             Wall                                                           
                                                                            
              New 153.6 159.8                            1.03/6.2m CL=TW Not
            South                                                 Calculated
         Footwall 194.3 194.6                           13.71/0.3m CL=??m TW
----------------------------------------------------------------------------
TW = True Width, CL = Core Length, VG = Visible Gold, Tell = Tellurides, Cut
 (i) = cut to 246.9 grams/tonne, Cut(ii) =cut to 120.0 grams/tonne, ?? TW = 
 True Width Unknown
About the Company

Kirkland Lake Gold Inc. is an operating and exploration gold company located in Kirkland Lake, ON in the Southern Abitibi gold belt. Its goal is to create a self-sustaining and long lived intermediate gold mining company based in the historic Kirkland Lake Gold Camp. The Company plans to do this by increasing production to 250,000 - 300,000 ounces per year in several stages, and by decreasing production costs by realizing the economies of scale associated with that higher production rate.

The results of the Company's underground diamond drilling program have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff (which includes a 'qualified person', Stewart Carmichael P.Geo., the Company's Chief Exploration Geologist, for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators). Mr. Carmichael also supervised the preparation of the information that forms the basis of the technical disclosure in this release.

The Company has implemented a quality assurance and control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the best possible practices. The drill core is sawn in half with one half of the core samples shipped to Swastika Laboratories in Swastika, Ontario. The other half of the core is retained for future assay verification. Other QA/QC includes the insertion of blanks, and the regular re-assaying of pulps and rejects at alternate certified labs. Gold analysis is conducted by fire assay using atomic absorption or gravimetric finish. The laboratory re-assays at least 10% of all samples and additional checks may be run on anomalous values.

The Company's Macassa Mine Property is the subject of a reserve report prepared by Glenn R. Clark, P.Eng. entitled Review of Resources and Reserves of Macassa Mine, Kirkland Lake, Ontario at January 1, 2012 dated May 29, 2012, which has been filed on SEDAR (www.sedar.com) under the Company's filings.
Share
New Message
Please login to post a reply