South Mine Complex Extended Further East
posted on
Nov 05, 2012 06:50AM
KGI is an operating and exploration gold Company in Kirkland Lake, Ontario which is located in the Lower Abitibi Greenstone belt in northeastern Ontario.
November 5, 2012
|
|||||
South Mine Complex Extended Further East; Drill Hole 53-2111A Assays 2.97 Ounces of Gold Per Ton Over 10.0 Feet True Width
|
|||||
KIRKLAND LAKE, ONTARIO--(Marketwire - Nov. 5, 2012) - Kirkland Lake Gold Inc. (the Company) (TSX:KGI)(AIM:KGI), an operating and exploration gold company, is pleased to announce drilling results from recently completed underground diamond drilling exploration program. This particular program includes further drilling on the HM property which was formerly held under a joint venture with Queenston Mining Inc. but which was acquired, along with the South Claims, North Amalgamated and other joint venture properties, from Queenston on August 30, 2012.
This most recent round of drilling on the HM claim and the adjoining west Macassa claim has served to extend the South Mine Complex to its furthest point east to date. (see figure 1) The following are some of the highlights of the new exploration programs: -- Drill hole 53-2111A returned 2.97 ounces of gold per ton (opt) (uncut) or 1.61 opt cut over a true width of 10.0 feet. This intersection has extended the New South Zone an additional 220 feet east from previously reported drill hole 53-1797 (8.55 opt uncut) or 3.5 opt cut over a true width of 0.9 feet. (see the Company's news release dated November 15, 2011). This is the furthest east intersection to date on the South Mine Complex bringing the total strike length to date of the SMC to approximately 3,500 feet. -- Drill holes 53-1978 and 53-1979 tested an inferred resource area of the New South Zone. Both of these drill holes returned high grade gold mineralization including 4.64 opt (uncut) or 2.34 opt cut over a true width of 17.5 feet (53-1978) and 3.45 opt (uncut) or 2.73 opt cut over a true width of 5.3 feet (53-1979). (see figure 2) -- Drill hole 53-1980 successfully tested potential footwall mineralization with three footwall zones intersected including 0.26 opt over a true width of 5.4 feet, a second zone assaying 2.12 opt (uncut) or 1.98 opt cut over a true width of 4.2 feet, and a third zone assaying 3.06 opt over a core length of 1.0 feet. Mr. Harry Dobson, Chairman commented, "The high-grade results over larger widths confirm our strategic thinking in acquiring 100% interest in these claims. Underground development is in place to both continue drilling on the HM and South Claims, and connect the eastern extension of the SMC to our trackless haulage ramp." -- Development is now proceeding on schedule with the 5300 level exploration drift now extended 100 feet east along the HM-North Amalgamated claim boundary. A large drill bay will be excavated 320 feet further along this drift which will enable the Company to fully explore the potential extension of the SMC to the east. This drift will continue eastward through the Kirkland Minerals, Teck Hughes and eventually the Lakeshore property, providing and excellent platform for exploration drilling to test for SMC style mineralization as well as other potential mineralized systems associated with the Main and South Breaks. -- Figure 1 - general plan view showing the location of the latest drilling results detailed in this release. -- Figure 2 - detailed plan view showing the latest drilling results from the underground drill program on the HM and Macassa claim. 5300 LEVEL EXPLORATION ---------------------------------------------------------------------------- HOLE DRILL FROM TO DIP AZIMUTH ASSAY HOLE No. ZONE (feet) (feet) (degrees)(degrees) (oz per ton/feet) ---------------------------------------------------------------------------- 53-2111A Hanging 666.5 670.5 -42 015 0.29/4.0' CL=??' TW Wall New South 686.1 700.0 2.97/13.9' CL=10.0' TW, Uncut 1.61/13.9' CL=10.0' TW, Cut(i) Incl. 686.1 687.5 20.66/1.4' CL=1.0' TW, Vg, Tell and 691.4 692.8 5.71/1.4' CL=1.0' TW, VG, Tell and 695.9 697.4 1.51/1.5' CL=1.1' TW ---------------------------------------------------------------------------- 53-1978 Hanging 529.0 533.5 -58 359 1.06/4.5' CL=3.7' TW Wall Hanging 593.5 595.0 0.58/1.5' CL=??' TW, VG, Wall Tell New South 615.5 636.4 4.64/20.9' CL=17.5' TW, Uncut 2.34/20.9' CL=17.5' TW, Cut(i) Incl. 615.5 617.2 9.53/1.7' CL=1.4' TW, VG, Tell and 617.2 619.2 13.58/2.0' CL=1.7' TW, VG, Tell and 632.3 634.4 22.17/2.1' CL=1.8' TW, VG, Tell Footwall 737.5 738.5 0.89/1.0' CL=??' TW, VG Footwall 750.5 751.5 3.10/1.0' CL=0.9' TW, VG, Tell Footwall 1,154.4 1,155.8 0.27/1.4' CL=??' TW ---------------------------------------------------------------------------- 53-1979 Hanging 513.0 514.5 -67 356 0.21/1.5' CL=??' TW Wall Hanging 523.0 526.7 0.70/3.7' CL=??' TW Wall Incl. 525.5 526.7 1.81/1.2' CL=??' TW, VG New South 552.0 558.0 3.45/6.0' CL=5.3' TW, Uncut 2.73/6.0' CL=5.3' TW, Cut(i) Incl. 553.0 554.5 2.23/1.5' CL=1.3' TW and 556.5 558.0 10.09/1.5' CL=1.3' TW, VG ---------------------------------------------------------------------------- 53-1980 New South 642.7 644.7 -45 344 0.02/2.0' CL= TW Not Calculated Footwall 799.7 805.5 0.26/5.8' CL=5.4' TW Footwall 967.5 972.0 2.12/4.5' CL=4.2' TW, Uncut 1.98/4.5' CL=4.2' TW, Cut(ii) Incl. 970.0 972.0 3.80/2.0' CL=1.9' TW, VG Footwall 986.0 987.0 3.06/1.0' CL=??' TW, Tell ---------------------------------------------------------------------------- 53-2108 New South 506.6 515.7 -70 042 0.28/9.1' CL=8.7' TW Incl. 511.6 512.6 1.62/1.0' CL=1.0' TW, VG Footwall 710.4 712.4 0.20/2.0' CL=??' TW Footwall 1,049.6 1,050.8 0.62/1.2' CL=??' TW Footwall 1,065.8 1,066.8 1.85/1.0' CL=??' TW ---------------------------------------------------------------------------- 53-2109 Hanging 566.6 568.6 -55 025 6.79/2.0' CL=1.6' TW, Wall Uncut 1.96/2.0' CL=??' TW, Cut(ii) Incl. 566.6 567.6 13.16/1.0' CL=??' TW, VG, Tell New South 596.7 607.4 0.53/10.7' CL=8.9' TW Incl. 606.2 607.4 3.02/1.2' CL=1.0' TW, VG Footwall 627.3 628.4 1.47/1.1' CL=??' TW, VG Footwall 867.2 869.1 1.34/1.9' CL=1.6' TW, VG ---------------------------------------------------------------------------- 53-2110 Hanging 354.6 356.1 -80 042 0.89/1.5' CL=??' TW, VG Wall New South 504.0 524.2 0.03/20.2' CL=TW Not Calculated Footwall 637.5 638.5 0.40/1.0' CL=??' TW ---------------------------------------------------------------------------- TW = True Width, CL = Core Length, VG = Visible Gold, Tell = Tellurides, (i)Cut = cut to 7.2 opt, (ii)Cut=cut to 3.5 opt.,?? TW = True Width Unknown 5300 LEVEL EXPLORATION ---------------------------------------------------------------------------- HOLE DRILL FROM TO DIP AZIMUTH ASSAY HOLE No. ZONE (m) (m) (degrees) (degrees) (grams per tonne/m) ---------------------------------------------------------------------------- 53-2111A Hanging 203.1 204.4 -42 015 9.94/1.3m CL=??m TW Wall New 209.1 213.4 101.83/4.3m CL=3.0m TW, South Uncut 55.20/4.3m CL=3.0m TW, Cut(i) Incl. 209.1 209.6 708.35/0.5m CL=0.3m TW, Vg, Tell and 210.7 211.2 195.77/0.5m CL=0.3m TW, VG, Tell and 212.1 212.6 51.77/0.5m CL=0.3m TW ---------------------------------------------------------------------------- 53-1978 Hanging 161.2 162.6 -58 359 36.34/1.4m CL=1.1m TW Wall Hanging 180.9 181.4 19.89/0.5m CL-??m TW, VG, Wall Tell New 187.6 194.0 159.09/6.4m CL=5.3m TW, South Uncut 80.23/6.4m CL=5.3m TW, Cut(i) Incl. 187.6 188.1 326.75/0.5m CL=0.4m TW, VG, Tell and 188.1 188.7 465.60/0.6m CL=0.5m TW, VG, Tell and 192.7 193.4 760.12/0.7m CL=0.5m TW, VG, Tell Footwall 224.8 225.1 30.51/0.3m CL=??m TW, VG Footwall 228.8 229.1 106.29/0.3m CL=0.3m TW, VG, Tell Footwall 351.9 352.3 9.26/0.4m CL=??m TW ---------------------------------------------------------------------------- 53-1979 Hanging 156.4 156.8 -67 356 7.2/0.4m CL=??m TW Wall Hanging 159.4 160.5 24.00/1.1m CL=??m TW Wall Incl. 160.2 160.5 62.06/0.3m CL=??m TW, VG New 168.2 170.1 118.29/1.9m CL=1.6m TW, South Uncut 93.60/1.9m CL=1.6m TW, Cut(i) Incl. 168.6 169.0 76.46/0.4m CL=0.4m TW and 169.6 170.1 345.95/0.4m CL=0.4m TW, VG ---------------------------------------------------------------------------- 53-1980 New 195.9 196.5 -45 344 0.07/0.6m CL= TW Not South Calculated Footwall 243.7 245.5 8.91/1.8m CL=1.6m TW Footwall 294.9 296.3 72.69/1.4m CL=1.3m TW, Uncut 67.89/1.4m CL=1.3m TW, Cut(ii) Incl. 295.6 296.3 130.29/0.7m CL=0.6m TW, VG Footwall 300.5 300.8 104.92/0.3m CL=??m TW, Tell ---------------------------------------------------------------------------- 53-2108 New 154.4 157.2 -70 042 9.60/2.8m CL=2.7m TW South Incl. 155.9 156.2 55.54/0.3m CL=0.3m TW, VG Footwall 216.5 217.1 6.86/0.6m CL=??m TW Footwall 319.9 320.3 21.26/0.4m CL=??m TW Footwall 324.9 325.2 63.43/0.3m CL=??m TW ---------------------------------------------------------------------------- 53-2109 Hanging 172.7 173.3 -55 025 232.8/0.6m CL=0.5m TW, Wall Uncut 67.20/0.6m CL=??m TW, Cut(ii) Incl. 172.7 173.0 451.20/0.3m CL=??m TW, VG, Tell New 181.9 185.1 18.17/3.2m CL=2.7m TW South Incl. 184.8 185.1 103.54/0.3m CL=0.3m TW, VG Footwall 191.2 191.5 50.40/0.3m CL=??m TW, VG Footwall 203.4 203.9 45.94/0.5m CL=0.5m TW, VG ---------------------------------------------------------------------------- 53-2110 Hanging 108.1 108.5 -80 042 30.51/0.4m CL=??m TW, VG Wall New 153.6 159.8 1.03/6.2m CL=TW Not South Calculated Footwall 194.3 194.6 13.71/0.3m CL=??m TW ---------------------------------------------------------------------------- TW = True Width, CL = Core Length, VG = Visible Gold, Tell = Tellurides, Cut (i) = cut to 246.9 grams/tonne, Cut(ii) =cut to 120.0 grams/tonne, ?? TW = True Width Unknown Kirkland Lake Gold Inc. is an operating and exploration gold company located in Kirkland Lake, ON in the Southern Abitibi gold belt. Its goal is to create a self-sustaining and long lived intermediate gold mining company based in the historic Kirkland Lake Gold Camp. The Company plans to do this by increasing production to 250,000 - 300,000 ounces per year in several stages, and by decreasing production costs by realizing the economies of scale associated with that higher production rate. The results of the Company's underground diamond drilling program have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff (which includes a 'qualified person', Stewart Carmichael P.Geo., the Company's Chief Exploration Geologist, for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators). Mr. Carmichael also supervised the preparation of the information that forms the basis of the technical disclosure in this release. The Company has implemented a quality assurance and control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the best possible practices. The drill core is sawn in half with one half of the core samples shipped to Swastika Laboratories in Swastika, Ontario. The other half of the core is retained for future assay verification. Other QA/QC includes the insertion of blanks, and the regular re-assaying of pulps and rejects at alternate certified labs. Gold analysis is conducted by fire assay using atomic absorption or gravimetric finish. The laboratory re-assays at least 10% of all samples and additional checks may be run on anomalous values. The Company's Macassa Mine Property is the subject of a reserve report prepared by Glenn R. Clark, P.Eng. entitled Review of Resources and Reserves of Macassa Mine, Kirkland Lake, Ontario at January 1, 2012 dated May 29, 2012, which has been filed on SEDAR (www.sedar.com) under the Company's filings. |