Massive Black Horse Chromite Discovery

Black Horse deposit has an Inferred Resource Now 85.9 Million Tonnes @ 34.5%

Free
Message: Good post from Pear3 on ST HS

If I may would like to add to a new gasfired production method for chromite, a slurry pipeline bringing the ore south to a gas reduction reactor in Nakina and a second parallel pipeline bringing natural gas north to two gas-fired electrical generating stations. Pear3's outline the possible solution to benefit both KWG and NOT that has been proposed by Frank on a number of occasions.

"a single underground shaft to access both Noront Resources’ Eagle’s Nest base metal project and the adjacent Black Horse chromite property"

Accessed either by rail via the chinese interest or, if determined not viable, as Frank has also suggested " a new gasfired production method for chromite, a slurry pipeline bringing the ore south to a gas reduction reactor in Nakina and a second parallel pipeline bringing natural gas north to two gas-fired electrical generating stations."

At least agreeing to a single shaft for BH chromite and NOT Eagles Nest would potentially get things moving attract much needed financing for both cos.

Share
New Message
Please login to post a reply