http://www.powerauthority.on.ca/power-planning/regional-planning/northwest-ontario
The 2014 draft remote community connection plan a 113 page document on connecting the fn communities and the ring of fire mines can be accessed through the above link at the bottom of the page. The draft came out aug 21 2014 however I do not recall seeing it posted