Massive Black Horse Chromite Discovery

Black Horse deposit has an Inferred Resource Now 85.9 Million Tonnes @ 34.5%

Free
Message: Pipeline, perhaps.

Forgot to mention, with a pipeline along the esker corridor there probably would be room for a railline to be built later, since a pipeline doesn't need as much space as a road, though pumping stations are required at intervals.

Share
New Message
Please login to post a reply