I talked with Bruce Hodgman of Kwg Resources.
I asked him about the Railroad.
He replied that everything is going to plan and that they have now staked two possible routes and they have hired Krech Ojard & Associates to provide the engineering services for the construction of the railroad link to the ROF (see press release on KWG site dated Sept 24).
I asked him about Cliffs and the Chrome Deposits.
He replied that Cliffs is very committed to this project and that the chrome is of the highest quality and would match or better other deposits in the world.
I asked him about the Smelter, if they have finalized a site.
He replied, as you know that a very large amount of electricity is required for the running of the smelter, they have looked into a few possible sites but no final site has been chosen.
I asked him about the on-going drilling.
He replied that they are still drilling and that the committee that has been set up, reviews and plans all drilling. The drill results is passed on to us (visuals only). The last drill cores were sent out for assays and those results should be released in mid November.
Thats it for now.......RL