In reviewing the assay results on Page 228 (Appendix P) of NI 43-101 published on Sedar on October 5th, 2009 I noticed that Drill Hole IMCEX-23 had 1.585% NI from meter 311.10 to meter 321.80 for a total of 10.7 meters. If you refer to Page 116 of the same document this Drill Hole appears to be adjacent to Drill Hole IMCEX-51 (shown as "in-progress"). Drill hole 23, from the scale on Page 116, appears to be between 25 and 50 meters SW, from Drill hole 51. Given that Hole 51, as reported in the news release, had 1.15% NI from meter 331.7 to meter 341.6 for a total of 10.9 meters. Could the results reported for Hole 23 be connected of those reported for Holes 51 & 52 even though it is between 25 and 50 meters away?
aatozz