Welcome To The Inspiration Mining HUB On AGORACOM

The company is exploring for nickel deposits on its Langmuir property near Timmins, Ontario; for nickel-gold-copper on its Cleaver and Douglas properties; and for molybdenum and rare earth elements at recently acquired Desrosiers property.

Free
Message: Connecting the dots "Open Pit Potential"

Connecting the dots "Open Pit Potential"

posted on Jan 09, 2009 06:57AM

After yesterdays release of extension drilling on three previously drilled holes I thought I would look a the holes they mentioned in the release. Yesterday we were told that nickel increased in the extension depths I see here that there are bit and pieces of 1% and higher.......pretty cool!!

http://www.inspirationmining.com/new...

News

INSPIRATION CONTINUES TO PROVE OPEN PIT


FOR IMMEDIATE RELEASE
August 1, 2006 TSX Venture – ISM
Frankfurt—OI8

Toronto, Ontario - Inspiration Mining Corporation (the "Corporation") is pleased to announce the results of the continuation of their diamond drilling program on its Langmuir Project, located in Langmuir Township south of Timmins, Ontario. The Langmuir Property consists of 69 unpatented contiguous mining claim units covering approximately 1090 hectares in the north-central portion of Langmuir Township, Porcupine Mining Division, and District of Cochrane, Ontario. The property is approximately 25 km southeast of Timmins, Ontario, and hosts the past producing Langmuir No.1 Mine, and majority of the past producing Langmuir No. 2 Mine.

Inspiration continues drilling the Langmuir Project – Langmuir No.2 Mine North Zone, which is located from approximately 80m to 536m northeast of the mine shaft.

The following assay results are from drill holes LN06-28 and Ln06-31, inclusively that were drilled 7m south of the North Zone Section 38+00m North. Drill hole LN06-28 and LN06-29 were drilled approximately 32m and 19m, respectively, up-dip of previously released LN05-21, while LN06-30 and LN06-31 were drilled down-dip of LN05-22 approximately 12m and 36m, respectively. The following table indicates the drill information for these drill holes.

Drill Hole

Grid Northing

Grid Easting

Dip

Azimuth (ast)

Section Northing

Section Easting

Length (m)

LN06-28

3263.30

1934.40

-50.00

300.00

3793

43.6

47.00

LN06-29

3255.20

1948.40

-49.74

300.00

3793

59.8

64.78

LN06-30

3240.70

1972.50

-63.16

300.00

3793

87.6

127.86

LN06-31

3234.10

1984.90

-63.79

300.00

3793

101.9

151.90

Inspiration has received, compiled and condensed the assay results for LN06-28 to LN06-31 as following:

Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LN06-28

24.83

44.00

19.17

15.72

62.89

51.57

0.620

and contains

31.85

41.00

9.15

7.50

30.02

24.62

0.943

includes

33.45

37.10

3.65

2.99

11.98

9.82

1.445


Drill Hole

From (m)

To (m)

Core Length (m)

True Width (m)

Core Length (ft)

True Width (ft)

Weighted Average Ni (%)

LN06-29

28.90

59.90

31.00

25.73

101.71

84.42

0.401

and contains

28.90

30.80

1.90

1.58

6.23

5.17

0.583

and

34.55

42.50

7.95

6.60

26.08

21.65

0.314

and

42.50

59.04

16.54

13.73

54.27

45.04

0.514

includes

42.50

45.20

2.70

2.24

8.86

7.35

0.664

50.00

59.04

9.04

7.50

29.66

24.62

0.605

50.00

55.00

5.00

4.15

16.40

13.62

0.584

57.45

59.04

1.59

1.32

5.22

4.33

1.352

LN06-30

66.75

110.75

44.00

29.66

144.36

97.30

0.374

or

76.20

110.75

34.55

23.29

113.35

76.40

0.383

and contains

66.75

77.20

10.45

7.04

34.28

23.11

0.380

and

87.40

110.75

23.35

15.74

76.61

51.63

0.436

includes

87.40

90.10

2.70

1.82

8.86

5.97

0.572

91.80

94.40

2.60

1.75

8.53

5.75

0.451

97.10

109.80

12.70

8.56

41.67

28.08

0.500

or

101.20

104.90

3.70

2.49

12.14

8.18

0.777

LN06-31

107.00

136.80

29.80

19.76

97.77

64.82

0.688

and contains

107.00

122.80

15.80

10.48

51.84

34.37

0.879

and includes

107.00

111.50

4.50

2.98

14.76

9.79

0.967

with

107.00

108.00

1.00

0.66

3.28

2.18

1.250

109.05

109.70

0.65

0.43

2.13

1.41

1.015

and contains

110.45

111.50

1.05

0.70

3.44

2.28

1.405

111.50

116.13

4.63

3.07

15.19

10.07

0.555

116.13

122.80

6.67

4.42

21.88

14.51

1.045

or

118.00

121.00

3.00

1.99

9.84

6.53

1.268

and

126.00

136.80

10.80

7.16

35.43

23.49

0.688

127.00

131.43

4.43

2.94

14.53

9.64

0.769

with

128.95

129.80

0.85

0.56

2.79

1.85

1.050

Drill hole LN06-28 collared into the bottom half of the nickel mineralization of the North Zone. The vertical depth of the overburden at this location is approximately 19.0m.

The nickel bearing sulphide mineralization, with estimations ranging from 1% to 20% fine grained disseminations and sulphide blebs up to several centimetres in size, is contained within serpentenized to talcose serpentenized komatiitic ultramafic extrusive flows with occasional spinifex texture.

The assaying technique used is the industry standard for base metal assaying, which uses nitric and hydrochloric acids that extracts nickel only from sulphide mineralization and not from nickel silicate minerals.

The assaying of sawn core samples was conducted by Swastika Laboratories, and included the insertion of blanks and standards. The Qualified Person in charge of the Langmuir Project and the person who prepared the technical data in this release is Kian Jensen, B.Sc., P.Geo. (Ont).

For further information, please contact Randy Miller, President of the Company, at tel: 905.853.7400, www.inspirationmining.com

For Investor Relations call:

Gale Capital Corporation
Ph. 604.221.7604
Fax 604.221.7606
galecapital@shaw.ca

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Share
New Message
Please login to post a reply