Lalor Exploration Yields More Precious Metal Intersections
posted on
May 05, 2009 02:30PM
Leading Base Metals Mining Company - Exploration, Mining, Metal Production and Sales
May 5, 2009 | ||
HudBay's Lalor Exploration Yields More Precious Metal Intersections
Lalor drill hole locations, assay results, and map, as well as a complete historical listing of holes, collars, intersections and assays and the September 19, 2008 NI 43-101 technical report, are available on HudBay's website: www.hudbayminerals.com |
||
TORONTO, ONTARIO--(Marketwire - May 5, 2009) - HudBay Minerals Inc. ("HudBay", "the company") (TSX:HBM) continues to add significant precious metal intersections at its 100% owned Lalor deposit in the Flin Flon Greenstone Belt. Highlights of those results include DUB 230 grading 23.11 g/t Au over 8.75 m, DUB234 grading 10.28 g/t Au over 13.00 m, and DUB204W03 grading 6.68 g/t Au over 24.44 m. As a result of ongoing drilling results, HudBay plans to spend an additional $6.1 million on Lalor exploration in 2009. The originally projected expenditure for 2009 was $6.9 million. "I am very pleased with the continuing excellent Lalor precious metal intersections," said Peter R. Jones, HudBay's chief executive officer. "This project, in terms of both base and precious metals, is a key opportunity for organic growth." The ongoing Lalor exploration program will focus on extensions to the previously identified footwall gold zone as well as improving knowledge about the continuity within the zone. The $6.1 million additional expenditure is expected to provide 10 new holes from surface and 16 wedges holes. Selected and notable precious metal intersections not previously reported: ---------------------------------------------------------------------------- Length Drill Hole Zone From (m) To (m) (m) Au (g/t) Ag (g/t) Cu(%) Zn(%) ---------------------------------------------------------------------------- DUB195W05 Hanging wall 773.25 777.38 4.13 9.10 55.81 1.51 3.23 ---------------------------------------------------------------------------- DUB195W05 Foot Wall 785.49 790.49 5.00 8.89 115.89 0.30 1.12 ---------------------------------------------------------------------------- DUB204W02 Hanging wall 936.61 940.30 3.69 13.83 98.28 0.44 1.65 ---------------------------------------------------------------------------- DUB204W02 Foot wall 950.26 964.90 14.64 4.55 2.64 0.05 0.02 ---------------------------------------------------------------------------- DUB204W03 Hanging wall 834.78 844.57 9.79 5.40 59.11 1.98 2.14 ---------------------------------------------------------------------------- DUB204W03 Foot wall 856.57 860.57 4.00 4.64 39.43 0.52 0.41 ---------------------------------------------------------------------------- DUB204W03 Separate 880.57 894.60 14.03 3.53 26.78 0.41 1.21 ---------------------------------------------------------------------------- DUB204W03 Not named 981.56 1006.00 24.44 6.68 52.54 0.21 0.43 ---------------------------------------------------------------------------- DUB204W02 Not named 972.00 976.00 4.00 12.51 46.20 0.99 0.06 ---------------------------------------------------------------------------- DUB220W02 Not named 869.00 875.00 6.00 18.77 203.37 0.32 0.01 ---------------------------------------------------------------------------- DUB221 Not named 1094.24 1104.21 9.97 6.58 26.47 0.76 0.11 ---------------------------------------------------------------------------- DUB222 Foot wall 820.47 823.48 3.01 15.10 176.90 0.87 1.76 ---------------------------------------------------------------------------- DUB226 Foot wall 875.15 900.15 25.00 3.94 14.61 0.28 0.15 ---------------------------------------------------------------------------- DUB226 Separate 909.00 913.00 4.00 25.98 129.80 0.13 1.05 ---------------------------------------------------------------------------- DUB228 Foot wall 855.32 858.14 2.82 6.38 81.65 1.41 1.89 ---------------------------------------------------------------------------- DUB228 Separate 863.91 869.74 5.83 13.35 111.55 0.13 0.19 ---------------------------------------------------------------------------- DUB229 Foot wall 869.34 881.00 11.66 13.08 38.40 1.14 0.94 ---------------------------------------------------------------------------- DUB230 Separate 855.25 864.00 8.75 23.11 91.28 1.15 0.81 ---------------------------------------------------------------------------- DUB233 Separate 965.84 985.77 19.93 6.87 17.18 0.16 0.05 ---------------------------------------------------------------------------- DUB234 Foot wall 866.50 879.50 13.00 10.28 45.08 1.09 1.12 ---------------------------------------------------------------------------- DUB234 Separate 900.00 922.00 22.00 4.91 9.65 0.15 0.51 ---------------------------------------------------------------------------- DUB235 Foot wall 886.76 901.79 15.03 4.15 8.16 0.16 0.18 ---------------------------------------------------------------------------- DUB235 Separate 928.69 936.59 7.90 9.30 33.42 1.13 1.90 ---------------------------------------------------------------------------- Drilling has also continued to test the zinc rich massive sulphide zones #10 and #20 aimed at upgrading the Inferred Resource to an Indicated Resource. Selected and notable copper/zinc intersections not previously reported: ---------------------------------------------------------------------------- From To Length Drill Hole Zone (m) (m) (m) Au (g/t) Ag (g/t) Cu(%) Zn(%) ---------------------------------------------------------------------------- DUB179W04 10 969.00 988.90 19.90 0.98 10.67 0.36 4.94 ---------------------------------------------------------------------------- DUB195W05 20 777.38 785.49 8.11 1.58 19.49 0.44 18.82 ---------------------------------------------------------------------------- DUB204W02 10 814.34 831.35 17.01 0.22 12.17 0.67 26.96 ---------------------------------------------------------------------------- DUB204W02 31 940.30 950.26 9.96 1.71 55.07 0.33 9.58 ---------------------------------------------------------------------------- DUB204W03 20 844.57 856.57 12.00 1.17 13.99 0.86 7.86 ---------------------------------------------------------------------------- DUB204W04 10 834.94 843.43 8.49 0.27 18.32 0.69 17.89 ---------------------------------------------------------------------------- DUB227 10 762.10 767.18 5.08 0.22 9.50 0.21 18.36 ---------------------------------------------------------------------------- DUB228 20 849.05 855.32 6.27 3.80 55.96 1.64 11.43 ---------------------------------------------------------------------------- DUB230 20 879.70 887.38 7.68 3.11 35.70 0.88 18.31 ---------------------------------------------------------------------------- DUB232 10 779.32 785.43 6.11 0.46 12.85 0.26 10.27 ---------------------------------------------------------------------------- Next steps Scoping studies are continuing on the Lalor deposit to identify access alternatives, development and mining methods, as well as potential production capacity and concentration options. The additional 2009 exploration program will focus on the precious metal zones and is expected to enhance the value of the deposit. Website Links: To view Lalor Drill Hole Locations, please visit the following link: http://media3.marketwire.com/docs/La... To view Lalor Assay Results, please visit the following link: http://media3.marketwire.com/docs/La... To view Lalor Location Map, please visit the following link: http://media3.marketwire.com/docs/La... About Lalor The Lalor deposit is located in the Chisel Basin of the Flin Flon Greenstone Belt. It has an Indicated Resource of 3.4 MT 1.9g/t Au, 20.5 g/t Ag, 0.71%Cu, 8.82% Zn, and an Inferred Resource of 13.2MT 2.9g/t Au, 34.1g/t Ag, 0.70%Cu, 8.19% Zn, as stated in the September 19, 2008 technical report. Six drills are currently turning at Lalor, which is approximately 15 km from HudBay's concentrator in Snow Lake, Manitoba. The ongoing exploration and evaluation of the Lalor deposit is a primary focus for the company. |