Due to inquiries from potential aggregate customers and other interested parties.
Highbank is currently reviewing data from drilling, seismic refraction surveying and topographic mapping done on the Swamp Point site in 2005-2006 to determine the potential for additional bedrock volumes within the property. Highbank did not include bedrock volumes in its original resource calculation (for further information please review the NI 43-101 technical report on a preliminary economic assessment for Swamp Point North, dated April 23, 2015, as prepared by Micon International Ltd.) on the Highbank company website. Bedrock from the property has been successfully used for road building and erosion control on the property, and samples of the rock are being shipped to Highbank's head office for testing. Highbank has met with DMT Geosciences Ltd. of Calgary, Alta., requesting advice regarding the scope of sampling (drilling) and testing that will be required for a NI 43-101 compliant, quarry rock additional volume determination.