Halo Expands Jungle Lake Open Pit TORONTO, ONTARIO, Jun 5, 2008 (Marketwire via COMTEX News Network) -- Lynda Bloom, President and CEO of Halo Resources Ltd. (the "Company") (TSX VENTURE:HLO)(FRANKFURT:HRL) is pleased to announce that drilling west of the Jungle Lake deposit has expanded the near surface strike length approximately 15%.
A short drill program tested areas north and west of the known resources where the mineralization is projected to come to surface. Four of the drill holes intersected semi-massive to massive sulphides with similar copper grades as the Indicated resource category but with zinc grades triple what is estimated for the rest of the deposit.
To view the map accompanying this press release please click on the following link: http://media3.marketwire.com/docs/hl...
"The additional holes at Jungle Lake extend the strike length of the massive sulphide zone by about 25% and demonstrate that the mineralization extends to within 41m of surface. The significant increase in zinc grades adds to the economic potential of the Jungle Lake deposit, which when taken in conjunction with positive results at the nearby Cold, Lost and Bob Lake deposits at the Sherridon VMS Property, impacts the potential of the entire district that we are exploring," says Lynda Bloom.
Halo filed a NI43-101 compliant resource estimate report for Jungle Lake (see press release January 8, 2008) that confirmed 1,325,000 tonnes in the Indicated resource category with an overall grade of 1.17% copper, 0.85% zinc and precious metal credits. In addition, there are 2,177,000 tonnes in the Inferred resource category with an overall grade of 1.10% copper, 0.67% zinc and precious metal credits.
A NI43-101 compliant report is in preparation to report on resource estimates for the Cold, Lost and Bob Lake deposits.
Webcast
Halo will be hosting a webcast immediately following this announcement to provide additional background information on the Sherridon Project. To view the webcast please follow this link www.investorcalendar.com/IC/CEPage.a... or visit the Halo website at www.halores.com.
Technical Highlights
Seven vertical diamond drill holes, for a total of 1,098m, were completed. Mineralized intervals are summarized in the following table and the accompanying map shows the location of 2008 phase of drilling to the west. The massive-sulphide intervals in holes DH08-103, DH08-105 and DH08-110 expand the potential open pit limits approximately 50m west. Hole DH08-113, to the north, improves confidence in the western extent of the resource model and continuity of the mineralized zone.
-------------------------------------------------------------- Interval Copper Zinc Silver Hole From (m) To (m) (m)(i) (%) (%) (g/t) -------------------------------------------------------------- DH08-103 71.45 75.42 3.97 0.89 2.25 5.7 -------------------------------------------------------------- DH08-105 40.70 46.11 5.41 0.60 2.22 5.2 -------------------------------------------------------------- DH08-110 113.04 118.19 5.15 0.64 2.10 5.9 -------------------------------------------------------------- DH08-113 174.20 177.47 3.27 0.35 0.99 6.2 -------------------------------------------------------------- (i) True width estimated as 85% of the interval.
Sampling, assaying and quality control procedures are consistent with those reported in the Technical Background of the press release issued February 15, 2007. The above information has been prepared under the supervision of Stephen MacConnell, who is designated as a "Qualified Person" with the ability and authority to verify the authenticity and validity of the data.
ON BEHALF OF THE BOARD
Lynda Bloom, President and CEO
About the Sherridon VMS Property
The Sherridon VMS Property covers an area of over 20,876 hectares and hosts the past-producing Sherridon Mine that was operated by Sherritt Gordon Mines from 1933 to 1950 and produced 7.7 million ones of ore with recovered grades of 2.46% copper and 0.8% zinc. Results from an airborne geophysical survey completed in the summer of 2006 identified an additional 122 targets. Over 25,000 m of diamond drilling have been completed since November 2006 and drilling continues year-round. A NI43-101 compliant resource estimate for the Sherridon Jungle Lake Zone has been filed on SEDAR and resource calculations are planned for the nearby Cold, Lost and Bob Zones. The property is located only 70 km northeast of the mining and metallurgical complex in Flin Flon operated by HudBay Minerals Inc. Future development of the property is facilitated by the presence of an all-weather road and railroad access as well as a power line and communications tower.
About Halo Resources Ltd.
Halo is a Canadian-based resource company focused on the acquisition of near production base and precious base metal deposits. Currently the Company owns or has an interest in 3 projects: Duport, which is an advanced stage gold project; Red Lake, which is a gold exploration project, and the Sherridon project that is a combination of mature and grassroots volcanogenic massive sulphide (VMS) copper, zinc and gold exploration opportunities. The Company is operated by an experienced management team and backed by a strong network of mining financiers. The Company's growth strategy is to develop a diversified portfolio of advanced mining projects.
This news release presents "forward looking information" within the meaning of the applicable Canadian securities laws that involve inherent risks and uncertainties. Forward-looking information includes, but is not limited to, information with respect to the proposed private placement. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Halo to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks related to financings; risks related to the integration of acquisitions; risks related to joint venture operations; actual results of current exploration activities; actual results of current or future reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other minerals and metals; possible variations in ore reserves, grade or recovery rates; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. Although the management and officers of Halo Resources Ltd. believe that the expectations reflected in such forward-looking information are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Halo does not undertake to update any forward-looking information referenced herein, except in accordance with applicable securities laws. Trading in the securities of Halo Resources Ltd. should be considered highly speculative.
SOURCE: Halo Resources Ltd.
Halo Resources Ltd. Lynda Bloom President & CEO (416) 368-7045 or Toll Free: 1-866-841-0068 Email: lbloom@halores.com Halo Resources Ltd. Marc Cernovitch Chairman (416) 368-7045 or Toll Free: 1-866-841-0068 (416) 368-9805 (FAX) Website: www.halores.com Copyright (C) 2008 Marketwire. All rights reserved. |