Based on what Argoz & Gwr just posted I am assuming that in the near future we have the possibility of a 1.5 million dollar per month inflow from operations.
That is, 2.7 million $ from production minus 1.2 oparations cost and not considering revenue streams 4th onwards mentioned by GWR.
That is a hefty amount to be applied into further exploration, drilling, mine expansion or improvements etc.
When we bought back the oxide mill from Hecla, my recollection is of a mention that it ( or just the infrastructure ) was originally designed to be a 1200 ton mill. Perhaps some oldtimer could confirm that for me? TIA.