They will be mining 600 tpd in total after running the gold pyrite concentrate in the new mill and tailings in the old mill to create gold pyrite con. This means 300 tpd of sulphide material through the flotation mill and 300 tpd of oxide material through the leaching mill just acquired. The material comes from different areas of the various mines and requires virtually no development work.
Increasing production of the leaching mill to 500 tpd as stated in the press release will require some further minor development work and the next phase will require some minimal mill upgrades and further development work to get to 750 tpd with the expected ultimate tonnage for this mill at 1000 tpd or slightly higher.
The same would be required to increase production to 400-500 tpd at the flotation mill, very doable.