There is also the likelihood the small 60 tpd mill will be running soon and processing the tailings which hold ver $25 million dollars of gold/silver. This also should help in the future.
The present 200 tpd production can now also be brought up closer to production capacity of 320 tpd since some storage space has been made available and since roasting the 7000 tonnes of pyrite con material should soon start in earnest.
I also note the gold equivalent of the deep 12 metre intercept of the A4 vein at depth is around 20 grams gold per tonne, not to shabby.