Very encouraging results again!
posted on
Mar 07, 2012 09:20AM
New Discovery Resulting in a 20KM Mineralized Gold Belt
Here is a review of predictions compared to results:
Hole 174:
Hole_Name | BD2011-174 |
Easting | 405778.538 |
Northing | 5156474.95 |
Elevation | 406.223 |
Azimuth | 135 |
Dip | -76 |
Length | 531 |
The collar location was to the east of 171 and parallel to it. Collar is still within T1 and going towards T2. This again is infill drilling and I would expect good results.
BD2011-174 23 25 2 2.24 BD2011-174 106 107 1 2.97 BD2011-174 221 253 32 2.01 BD2011-174 266 267 1 2.33 BD2011-174 406 431 25 3.08
Nothing to be dissapointed here with! Grades better with depth.
Hole 175:
Hole_Name | BD2011-175 |
Easting | 405850.588 |
Northing | 5156472.366 |
Elevation | 407.413 |
Azimuth | 135 |
Dip | -71 |
Length | 549 |
Collar location is above T2, east of T1 going into T2. This again is a fairly long hole that should hit T2 fairly well but would extend T2 to the South East and at depth if they hit in the deeper section of the hole. For the first 200m or so, this is infill drilling so expect good numbers in the top half of the hole.
BD2011-175 158 203 45 1.20 Including 168 174 6 1.64 Including 176 183 7 2.00 Including 187 193 6 1.29 Including 196 203 7 2.59
We hit well in the first 200m as I predicted but no bonus at depth here;(
Grade improves with depth.
Hole 176:
Hole_Name | BD2011-176 |
Easting | 405886.509 |
Northing | 5156530.595 |
Elevation | 408.847 |
Azimuth | 135 |
Dip | -81 |
Length | 588 |
Collar location is further east of 175, over T2, long and steep. Again infill drilling of T2, I expect decent numbers here.
BD2011-176 257 284 27 1.69 Including 257 258 1 5.81 Including 274 275 1 35.60
Nothing dissapointing here again. Notice the better grades again at depth!
Hole 177:
Hole_Name | BD2011-177 |
Easting | 405724.741 |
Northing | 5156473.685 |
Elevation | 407.18 |
Azimuth | 135 |
Dip | -55 |
Length | 252 |
Collar location was at the top of T1. This is a fairly shallow hole with moderate dip important for the resource estimate and infill drilling again. I expect good results here.
BD2011-177 52 59 7 1.68 Including 52 56 4 2.16 BD2011-177 150 171 21 0.72 Including 160 162 2 2.94
This holes was a little dissapointing since it was on the top of T1 but still not a bad hole.
SGS putting all these results in a 3D model is what will be important here. Without
seeing what this looks like in 3D, it is hard to know what this ore body does under-
ground. One thing for sure, we keep getting economical grades over very good widths
and that bodes well for our 43-101 RE.
Glorieux