The trenches were as follows:

The current program was carried out on three different zones including Timmins 1 (T1),

the Ascot/Road, and the 88 zones. A total of 280 metres of trenching was completed in 16

individual trenches. 5 trenches totaling 84.0 metres were completed on the T1 Zone, 2

trenches (18.0 metres) completed on the Ascot / Road Zone and 9 trenches (178 metres)

were completed on the 88 Zone. Drilling and blasting services were provided by Forages

La Chaudiere Inc. of St-Georges, Quebec. Crushing equipment was supplied and

operated by a local contractor, M. Paul Labrie of St-Magloire, Quebec.