Bingo Stope Extraction Schedule
The following stope extraction schedule closely matches the number of days the company would have been in production for the last quarter of the fiscal year, ending Q1.
30, 300 tons gives you about 86 days of production, not including the ore from the at-surface open pit, which is about 10 more days than they actually would have produced gold from the mine in Q4 fiscal year 2011. The stopes are actually labelled on the longitudinal diagram, pg. 117.
Note that a 25m X 25m X 2m.(assumed) extraction stope is almost twice the amount you need to take out on any given day, so they should be blasting out this amount once every two days. The centre of the mine is the high grade ore shoot, ranging ~100-150m. While the sides are lower grade.
Screenshot from pg. 120 of the Updated Technical Report

supersize: http://www.flickr.com/photos/11747277@N07/5719522021/sizes/l/in/photostream/
-F6