1) hole #45 completed, on holes 46,47 and 48. All 3 drills going great.
2) ven still doing a lot of drilling right on our border, we have one drill there right beside them.
3) we are currently drilling a little deeper to define the deep intercepts we had in the previous holes that ended in mineralization.
4) the director that does our nr,s is back in the office tomorrow.