<<<All 9 holes for phase II have been drilled to depth and currently are being cut and logged.>>>
We have drilled 13 holes in this Phase II program !
<<<Red Ore IPO is scheduled for July with a 30 cent PP and a 50 cent warrant>>>
RedOre PP was done for $ 0.50 with $ 0.75 Warrant !
How reliable is this poster ?
FANTOMAS