Re: from Hoov - Abitibi recommendation
in response to
by
posted on
Mar 17, 2011 07:11PM
4 projects in Ontario, Quebec and Nevada (Gold, Silver,Copper,REE)
In fact, the Abitibi 3D geophysics report recommended only 4 drill holes with a total length of 980m :
"In order to confirm the five geophysical features considered as first priority anomalies (C1, C-2, C-9, C-11 & C-12) we suggest four (4) drill holes (DDH).The following table illustrates the locations, the target depths, as well as the estimated length of the drill hole required to go through the entire geophysical feature."
Drill Hole ID |
Easting (mE) |
Northing (mN) |
Azimuth (degree) |
Dip (degree) |
Target Depth (m) |
Total length (m) |
RG11-10 |
324675 |
5329460 |
10 |
-60 (to the north) |
C-9 140 |
280 |
RG11-11 |
324700 |
5329375 |
0 |
-60 (to the north) |
C-11 140 |
270 |
RG11-12 |
324540 |
5329370 |
20 |
-60 (to the north |
C1 & C2 10-100 |
150 |
RG11-13 |
324560 |
5329648 |
199 |
-80 (to the south) |
C-12 50-130 |
280 |
I was inquiring with the company about additional targets being drill tested (especially C4), but haven“t heard anything yet.
Seems they have added substantially to the Abitibi recommendation.
FANTOMAS