Over 10 years of EEstor LIES resulting in no disruptive product, no disruptive technology or a single manufacturable product!
This is just another example of utter BS peddled by Francois Desloges in 2017:
fdesloges reply 3/10/17 1:28 p.m.
sherlock: Fair enough! :smile:
I'm responsible of leading 2.5M$ of the 3M$ last summer PP with my partners. And with one of these partners, for being behind ~30% of last Fall raise in SP for the 39¢ warrants worth ~2M$ to reach EEStor. All I got for that (on top of the stocks and warrants obviously) was a chance to visit CP last September.
I did a quite thorough one month long DD with Ian last summer before jumping in up to the neck, and bringing with me the PP partners and later some total ~80 persons in ESU stock.
Just write Ian or Paul Mesburis an email for proof of my credentials.
I'm confident because of EEStor ED / Advanced Polymer Program repeatedly clearly stated objectives. And because of the way the ASG deal is structured. They don't get paid unless they hit EEStor milestones. Since they're mostly paid in stock, the higher they hit the better they succeed.
I know that IC and co consider Lead-Acid ED low hanging high-reward fruit to the grid market and that they still aim at EESU original spec. (That was my first DD question).
I'm thus confident (without knowing) that these are ASG objectives. If they're willing to sign such agreement with EEStor is that they think they can deliver. Otherwise they wouldn't bother.
I also know by a last Jan NR that they're working with our internal (AMAZING, said IC) new chemist Dr Paul on High Polarity Polymers in house and from ASG .
I interpret this:
" Dr. Paul's initial focus will be on the development of flexible plastic CMBT-based high energy density storage systems, including the collaboration with and integration of advanced polymer solutions developed by our consultants at ASG, with the potential of achieving multiple technical and large-scale production advantages."
as meaning that the transfer of high polarity polymers from ASG is started for almost two months now.
And that it will most likely not take 9 months before giving birth to significant ED.
I'm ready to support, and need be, lead more financing effort to reach that goal.
Voilà! :smile:
N.B. As could be read this morning, I keep finding traces in DW passed recorded answers of quantitative hints that ED could be reached through the contribution of multiple avenues: V increase (E then grows by V²), polarity/permittivity, and Stacking Effect tuning in favor of C. We "only" need the multiplied combining of these effects to reach 10000 over IT-3 spec 0.01 Wh/l for ED to reach 100Wh/l. We aleady got 2x from V increase and 4.5x from stacking effect in store with IT-4.
So I'm optimistic for the Advanced Polymer Program and further Stacking Effect refinement to deliver. :slightly_smiling_face: