From Slack Eestor lala land,
fdesloges wrote 7/26/17 1:25 PM
"I've been saying it again and again starting long before I was under NDA. They declared under oath they once did 700 Wh/l in hand made lab samples. "All" they need to do is replicate these in a high yield low cost industrial process. The task ahead (and for the last 10 years) is/was all about industrial engineering. It's obviously not a trivial task. It took until 2009 to get the CMBT industrial process alone right. And the entire endeavour was slowed down considerably from then to last early Fall. But it kicked back in high gears since. At some point, as Ian said in an e-mail that was recently published, results will be disclosed as part of the company re-launch. Your part in that game on this side of the mirror is to be patient. And rely on your rationality to temper your impatience, considering all the supporting evidence that's already been disclosed. Go enjoy the summer while they work their butt off and Happy waiting!" :simple_smile: