"Winter Program Expansion: As a result of highly positive drill results, together with drilling speed and efficiency and favorable winter conditions, the winter exploration budget is being expanded by an additional $3M. This equates to approximately 6,270m (28 holes) of additional drilling for a total of 26,500m in 91 holes. The additional meters will be used to test high-priority areas within the R780E Zone where specific step-out targeting of the high-grade domain is prospective. Additional drilling is also planned to further test the recent discovery of high-grade mineralization at the R600W zone, located 555m on strike to the west of the Triple R deposit."
Very interesting.
The winter must be continuing in the AB.
This extra drilling likely means there will be a revised RE by summer. Likely close to 150M lbs.