Highly prospective exploration company

Resource projects cover more than 1,713 km2 in three provinces at various stages, including the following: hematite magnetite iron formations, titaniferous magnetite & hematite, nickel/copper/PGM, chromite, Volcanogenic Massive and gold.

Free
Message: Champion Minerals' Drillhole LM11-09 Intersects 359m Grading 30% Total Iron

September 15, 2011

Champion Minerals' Drillhole LM11-09 Intersects 359m Grading 30% Total Iron at the Moire Lake Project in Cluster 1 of the Fermont Holdings

- Drillhole LM11-10 intersects 249.5m grading 22.3% Total Iron including an interval of 130.7m grading 29.1% Total Iron

TORONTO, ONTARIO--(Marketwire - Sept. 15, 2011) - CHAMPION MINERALS INC. (TSX:CHM)(FRANKFURT:P02) ("Champion", or the "Company") is pleased to provide an update of drilling results from the Company's Moire Lake Project in Cluster 1 of the Fermont Holdings in north-eastern Quebec. The Moire Lake Project is strategically located adjacent to ArcelorMittal's operating Mont Wright Mine and Concentrator Complex and 8km south of existing rail transport infrastructure. Drillhole LM11-09 intersected 358.9 metres ("m") grading 30.3% Total Iron ("FeT") on the southeast side of the historic Lac Moire Occurrence(1), confirming the continuity of the iron-rich Sokoman Formation around the southern fold closure. Drillhole LM11-10, located on the southwest side of the historic Lac Moire Occurrence intersected 249.5m grading 22.3% FeT including an interval of 130.7m grading 29.1% FeT. Results from hole LM11-10 successfully validate a historic intersection of 206.1m grading 24.1% FeT including an interval of 143.3m grading 34.1% FeT reported for drillhole QE61(2). Table 1 provides a list of select composite assay results for holes LM11-06A to LM11-10 inclusive.

----------------------------------------------------------------------------

TABLE 1 - SELECTED(i) COMPOSITE ASSAY RESULTS (HOLES LM11-06A to LM11-10)

----------------------------------------------------------------------------

HOLE

HOLE-ID LENGTH AZIMUTH DIP FROM TO INTERVAL(ii) GRADE(iii)

----------------------------------------------------------------------------

metres degrees degrees metres metres metres Total Fe%

----------------------------------------------------------------------------

LM11-06A 352 60 -55 3.0 95.7 92.7 17.4

----------------------------------------------------------------------------

and 133.0 179.7 46.7 16.8

----------------------------------------------------------------------------

and 197.9 232.2 34.3 18.2

----------------------------------------------------------------------------

Share
New Message
Please login to post a reply