http://finance.yahoo.com/news/falcon-oil-gas-ltd-full-060000269.html
<"Looking ahead, with our fully funded 2015 Australian drilling campaign on track to commence this summer...">
"This summer". In other words, late June at the earliest (more likely July/August).
<"collect data points for subsequent vertical/horizontal drilling, completion and production testing.
Formation evaluation and reservoir characterisation will be carried out from these initial three wells through petrophysical interpretation, core analysis, geomechanical studies and stimulation design.">
It sounds to me like these initial wells might not even be flow-tested, ...which is really quite a shame, since the actual flow rates is arguably the most important parameter of the entire project.
Maybe next year.
jmo