>Hi lanman, a small point. In #2 you say "simutaneously". Would you prefer to say consecutively or one after the other?
Not really. I would imagine they will frac consecutively, but due to the length of time it takes to do a proper flow test, the flow testing will be simutaneous.
Regardless of the actual details, my point was that they most likely want to have 3 or more wells ready to go prior to bringing in all the equipment from Germany, Holland, Scotland, etc.
Do you remember the Farming Forum posts from a year ago, where someone who was on site made a few posts in regards to the Magy?
"The stuff arrives on location and is set up over about four days, the actual Frac jobs take less than 12 hours and it is then all uprouted and sent back to Germany and Holland."