Vancouver, B.C. – Musgrove Minerals Corp. (“Musgrove” or the “Company”) (TSX.V: MGS) is pleased
to report, it has completed 24 of the 32 planned In‐fill RC‐drill hole program with 14,265 feet (4348
meters) drilled in 2011 on the 100% owned Empire Mine Project located in the Alder Creek Mining
District in Custer County, Idaho.
Results for the earlier released 14 holes predominately drilled in the northern mineralized zone are
highlighted as follows; Highlights include: EM11‐08 20ft of 1.24% Cu including 10ft of 34.90gm/T Ag,
EM11‐09 120ft of 0.60% Cu including 100ft of 26.63gm/T Ag and .0.64% Zn, EM11‐02 90ft of 0.62% Cu.
The 32 hole drill program completes the original 65 hole drill program outlined in the Company’s 43‐101
technical report. In 2006 the Company drilled 33 holes (13,240ft), consisting of 5 NQ core and 28 RC at
an incline of ‐45 degrees. The holes focused on the AP Pit area in the southern half of the mineralized
body. The holes in the current infill drill program are ‐50 degrees which is approximately 85‐87 degrees
from the presumed attitude of the mineralization but the attitude of the mineralized zone is
inconsistent and variable. True widths of the mineralized zones are variable and unknown.
The 32 hole drill program will complete the original 65 hole drill program outlined in the Company’s
43‐101 report. The highlights of the 2006 drill program include:
JDD05a ‐ 77m (253ft) of 0.65% Cu and 25 gm/T Ag,
JRC 11 ‐ 53m (174ft) of 1.37% CU and 29.7 gm/T Ag,(including 9m (30ft) of 4.64% Cu and 126.6 gm/T Ag),
JRC 15 ‐ 98m (322ft) of .49% CU,
JRC 27 ‐ 9m (30ft) grading 5.72gm/T Au (incl 1.5m (5ft) at 26.4 gm/T Au).