We have a minimum of 12,000 m planned, but can probably accomplish 15,000 m. We are permitting 33 drill sites, some will have multiple holes.
A breakdown of our drilling will look like…
- 60% on the North Stock target infilling and extending the zone encountered last season; roughly 20-22 holes; 7200-9000 m total.
- 20% at Antelope Basin; about 6-8 holes; 2400-3000 m total
- 10% between Antelope Basin and North Stock mainly targeting structures; 3-4 holes; 1200-1500 m total
- 10% other targets including South Stock; basically 1 hole in each of 4 new targets; 1200-1500 m total
As the time approaches and if the permit is approved, we will be able to share more detailed info.