Welcome to the Electrovaya Hub on AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: Re: My question is....
2
May 27, 2015 09:07AM

May 27, 2015 09:30AM

May 27, 2015 09:43AM

May 27, 2015 09:48AM

May 27, 2015 10:22AM

May 27, 2015 11:01AM

May 28, 2015 05:21PM

May 28, 2015 05:39PM

May 29, 2015 07:23PM

I was thinking and that is dangerous... If I were doing it, I would shut down one line, say 5 and remove the NMP equipment. (30 days) Then I would start installing the EFL equipment while the demo team worked on removing the old cell assembly equipment that would not be needed. (another 30days) When line 5 was about ready to go into start up, I would shut down line 4 and move in the demo team. (30 days) Startup on line 5 should be about complete with operator training and ramp up in progress. Once line 5 is making good product I would then shut down line 3 and start demo while line 4 is completing equipment install. Now with 2 lines down and 3 running a second shift may be needed to keep up the production rate. Anyway you can see the idea... I would think EFL would do something like this.


May 30, 2015 11:45AM

May 31, 2015 11:22AM
Share
New Message
Please login to post a reply