Developing the Kasala Project In The DRC

Latest assay results have confirmed that copper mineralization has a minimum strike length of approximately 800 metres and a width of approximately 250 metres

Free
Message: REMINDER - Join El Nino Ventures at the 2010 PDAC – Booth 2105

REMINDER - Join El Nino Ventures at the 2010 PDAC – Booth 2105

posted on Mar 09, 2010 04:38PM

March 7, 2010 - March 10, 2010

Metro Toronto Convention Centre, South Building
Toronto, Canada
Booth #2105

Share
New Message
Please login to post a reply