Developing the Kasala Project In The DRC

Latest assay results have confirmed that copper mineralization has a minimum strike length of approximately 800 metres and a width of approximately 250 metres

Free
Message: 61 contracts not viable in DRC
Great, thank you for confirming this.
Share
New Message
Please login to post a reply