On Page 2 of the report:
"An operational update is expected to by provided by Junex in the next several weeks".
This news release should be significant because it should give a better idea on the flow rates and EUR for each well.
Cannaccord:
Initial Flow Rate = 180,000 cubic feet per day
EUR = 0.5 BCF
I believe that final flow rates could 1,000,000 cf/d and the EUR could be 1.0 BCF+.
The news release is due between December 16 and 23.
The volume today (12/8) is very low 23,150 and it looks like JNX could easily go up on good news.