Message: Government bond canceled only to retired miners and Caura watershed

This is good news that it is finally happening, it is one of the few remaining “next steps” outlined on CVG’s website (the final point in the translation below). I doubled my total holding of KRY shares yesterday and today – I’m so excited that it’s so cheap that I could do that! Can hardly wait to hear what I believe is inevitable good news and finally make some money on this!

NEXT STEPS

  • APROBACIÓN DEL ESTUDIO DE FACTIBILIDAD TÉCNICO – ECONÓMICO - FINANCIERO POR PARTE DEL MEM. ADOPTION OF TECHNICAL FEASIBILITY STUDY - ECONOMIC - FINANCIAL BY THE MEM.
  • APROBACIÓN DE SOLICITUD DE PRÓRROGA POR PARTE DEL MEM, PARA EL INICIO DE LA PRODUCCIÓN EN EL PROYECTO LAS CRISTINAS, EN EL MARCO DE LO ESTABLECIDO EN LA CLÁUSULA NOVENA DEL CONTRATO ENTRE CVG – MEM Y EN VIRTUD DE LOS RETRASOS PRESENTADOS PARA OTORGAR EL PROYECTO A LA EMPRESA OPERADORA (CRYSTALLEX INTERNACIONAL CORP.) FIRMADO EL 16 DE SEPTIEMBRE DEL 2002. APPROVAL OF APPLICATION FOR EXTENSION BY THE MEMORY FOR THE START OF PRODUCTION IN THE PROJECT Las Cristinas, IN CONNECTION WITH AS THE NEUVIČME CLAUSE IN THE CONTRACT BETWEEN CVG - MEMORY AND IN ACCORDANCE WITH DELAYS SUBMITTED TO GRANT TO THE DRAFT The company operates (Crystallex International Corp..) SIGNED ON 16 SEPTEMBER 2002.
  • REVISIÓN Y/O APROBACIÓN DEL ESTUDIO DE IMPACTO AMBIENTAL POR PARTE DEL MARNR Y APROBACION DE LOS PERMISOS AMBIENTALES SOLICITADOS. REVIEW AND / OR ADOPTION OF ENVIRONMENTAL IMPACT STUDY BY THE MARNR AND ADOPTION OF ENVIRONMENTAL PERMITS REQUESTED.
  • SOLICITUD DE FIANZA AMBIENTAL, UNA VEZ APROBADO LOS PERMISOS AMBIENTALES. APPLICATION OF ENVIRONMENTAL SECURITY, once approved environmental permits.
  • CONCLUSIÓN DEL PROYECTO DE: MEJORAMIENTO Y ASFALTADO DE LA VIALIDAD EXISTENTE DESDE EL KM 85 HASTA LAS CRISTINAS, AMPLIACIÓN DEL AMBULATORIO Y CONSTRUCCION DE LA PLANTA DE TRATAMIENTO DE AGUAS SERVIDAS. TERMINATION OF THE PROJECT: IMPROVING THE Roads and asphalt EXISTING UP TO 85 KM FROM THE Las Cristinas, from the ambulance EXPANSION AND CONSTRUCTION OF THE PLANT sewage treatment.
  • CONTINUAR CON EL PROYECTO DE INGENIERÍA DE DETALLE PARA LA CONSTRUCCIÓN DE LA PLANTA DE PROCESAMIENTO DE MINERALES Y DEMÁS INFRAESTRUCTURAS. CONTINUE WITH THE PROJECT DETAILS OF ENGINEERING FOR CONSTRUCTION OF MINERAL PROCESSING PLANT AND OTHER INFRASTRUCTURE.
  • CONSTRUCCIÓN DE PLANTA DE PROCESAMIENTO PAUTADA PARA EL 3ER TRIMESTRE DEL 2004. CONSTRUCTION OF PROCESSING PLANT 3ER GUIDELINES FOR THE QUARTER OF 2004.
    INVERSIÓN TOTAL ESTIMADA: 242,76 MMl US $ (PLANTA : 80,0 Mil US $). Estimated total investment: U.S. $ 242.76 MML (PLANT: 80.0 Mil U.S. $).
  • CONTINUAR CON LOS PROGRAMAS DE MANTENIMIENTO, SUMINISTROS Y DEMÁS GASTOS DE FUNCIONAMIENTO DEL CENTRO HOSPITALARIO, CONTINUAR CON LA ASISTENCIA TÉCNICA A LAS ASOCIACIONES DE PEQUEÑA MINERÍA. CONTINUE WITH THE PROGRAM OF MAINTENANCE, SUPPLIES AND OTHER COSTS OF OPERATION OF THE HOSPITAL, CONTINUE WITH THE SUPPORT OF ASSOCIATIONS OF SMALL MINING.
  • MANTENER EL PROGRAMA DE BECAS Y PASANTÍAS DE ESTUDIANTES, ASÍ COMO EL DE ENTRENAMIENTO DEL PERSONAL. KEEP THE PROGRAM fellowships and internships STUDENTS, AS WELL AS THE COACHING STAFF.
  • OBTENCIÓN DE SEGUROS PARA EQUIPOS E INSTALACIONES Y DE FIANZA LABORAL. PROCUREMENT OF INSURANCE FOR EQUIPMENT AND FACILITIES AND JOB SECURITY.
  • REUBICACIÓN DE LOS INVASORES ILEGALES. RELOCATION OF ILLEGAL invaders. SE REQUIERE EL APOYO INSTITUCIONAL DEL MEM Y DEMAS INSTITUCIONES DEL ESTADO. REQUIRED OF INSTITUTIONAL SUPPORT MEM and other State institutions.