Drilling:
The 2024 program consists of 2 drills and a planned 4,500-meter geotechnical drilling campaign allocated to the proposed open pit Highwall, TMF, and RSFs. The exact drilling allocations will be determined after receiving final results of the Pit Slope Stability study and interpretation of the geotechnical data collected in 2023. This work is expected to be received by the end of March 2024.
^ Set themselves up for failure to meet a deadline once again! Watch if March doesn't turn into June. And, of course, will the weather hold up? Will the drills reach the target depth?
Stayed tuned! Sometimes I wish I was Rip Van Winkle. Just let me wake up and this friggin nightmare will finally be over.