"The geotechnical data gap analysis has been completed and will inform the scope of the 2023 geotechnical drill program designed to identify opportunities to further decrease the life of mine ('LOM') strip ratio and strengthen base case overall pit slope design criteria"
So that's the second time we are hearing this! A 2023 geotechnical drill program to decrease strip ratio. Why tell us this? Do we intend to see that program through? Is this important to Cuu? This means a further delay to our exit resulting in a buyout at minimum...2024 time period if they want to see results of a 2023 program :/
investors are already sick and tired and didn't want to see 2022 but we said sure, let this campaign be the last of it!
Why does Elmer keep mentioning 2023 drilling!!??