Copper fox has secured the Port facilities from October 2011 to April 19 2019. However based on the Feasability study first production will begin Dec 2019. Is this just a simple matter of extending the contract, or does this indicate we may be in production sooner than Dec 2019?
I actually phoned the shipping company about 2 weeks before the BFS came out. That man was a world of information of the CUU story.
I had asked him that very question....I was told that it would be just a matter of extending the timeline but he didn`t think that the timeline would need to be extended. I also asked him if the production were to increase, would that be possible. He told me YES....they have more room to expand. Furtthermore...the CUU area for shipping hasn`t been built yet. I asked him....when would that take place. He told me that it would not take long to build it ....they would be done way way before CUU goes into production. So this IMO is not an issue