CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
Thanks Golfyeti. That sentence could be read two ways. One way suggests that there was Titan work completed in 2012 and the other way that 2012 Mira work was completed on the Aerials - done in 2011 and '12 - plus the Titan done in 2011 (and 2012?). I don't see any conclusive statment that Titan was done in 2012 in any of our NR's.