Re: Calendar - sept 21
in response to
by
posted on
Sep 20, 2012 02:04PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
If you look at the calendar it makes sense to release the Feasibility next week, Tuesday for example. Then the Toronto conference is on Thursday. I would be worried about releasing it tomorrow and having the momentum stopped by the weekend.
Perhaps tomorrow we'll get the mine plan and the MIRA as a teaser.
If this Feasibility is going to show an improved Capex, and I have to think it will because Elmer surely wouldn't keep saying so at this point, then this could be received with some enthusiasm.