Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: nr question

"When you read it carefully, that statement is ambiguous.An interval has a start point and end point. We know the end point – it is 769m.But what is the start point? is it 769-250= 519 m (a 250m interval) or is it from 250m to 769m (a 519m interval).That is a big difference."

DDH 2012CF427 located 400m north of DDH 2012CF426 with a core length of 769.3m intersected visible copper +/- molybdenite mineralization from a core interval of 250.0m to the end of the drill hole at 769.9m. The chalcopyrite+/-molybdenite mineralization is open at depth,

The core interval starts at 250.0 metres and ends at 769.9 metres.

Share
New Message
Please login to post a reply