CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
Also from my current top pick section: Teck CUU relationship:
TECK AND COPPER FOX RELATIONSHIP
It seems Senior Teck engineers and Copper Fox Metals have a very good relationship. Teck has been working closely with Copper Fox Metals on the upcoming Feasibility:
Teck & CUU (1) So with all these pieces in place, and a resource table expected in late April, pit design optimizations will lead to a complete mine feasibility study, which Stewart hopes to see this summer. “At that point, Teck Cominco will elect to earn a 20%, 40% or 75% interest, or walk away with a some shares and a 1% royalty,” explains Stewart. “That decision should come quickly. We’ve kept a transparent flow of information with Teck, the provincial and federal agencies and the Tahltan First Nations so everyone can decide quickly because they all helped us get it there.”
Teck & CUU (2)The company has a relationship with Teck, Canada's largest diversified mining company, can you explain the significance of this relationship to our readers?
Teck has an earn-back right pursuant to the Option agreement entered into in 2002. We have been working with the senior technical people from Teck since early 2010 when we announced that we were proceeding to complete a feasibility study on Schaft Creek. The purpose of engaging Teck early on in the process of completing the feasibility study was to have their input into the feasibility study that is required to allow Teck to make their decision as to their participation in the Schaft Creek project. Teck’s experience in operating open pit mines of the size of that contemplated at Schaft Creek is valuable information that helps makes the feasibility study a realistic and practical study in the contexts of developing the deposit.
Lawrence Roulston (1)Teck is working closely with Copper Fox in conducting the feasibility study. The Vancouver-based major operates a large copper mine near Kamloops, British Columbia and also has a huge base metal smelter-refinery complex at Trail in the southern part of the province.
Lawrence Roulston (2)Copper Fox is about to start field work on the Schaft Creek copper-gold deposit in northern British Columbia. A feasibility study is due for completion by the end of June and is being led by Wardrop, a highly regarded international engineering firm. The work is being done in close cooperation with Teck, a major mining company from whom Copper Fox is acquiring the project. The study considers a minimum 120,000 tonne per day open pit mine. The resource estimate supporting the feasibility study outlines 1.4 billion tonnes hosting 7.7 billion pounds of copper, 8.1 million ounces of gold, 584 million pounds of molybdenum and 69 million ounces of silver.