Just curious if CLL was planning on using more than 15 SAGD well pairs on the future Algar project? should their production level be much higher than 10,000 bbl/d vs the 15 pairs that they are presently using on the Great Divide that will be producting at least 10,000 bbl/d?
http://www.connacheroil.com/operations/algar.html
Initial estimates are that 15 to 20 SAGD well pairs can produce the maximum design capacity of 1,600 cubic meters of bitumen per day
Target output rate also 10,000 bbl/d of bitumen – start-up end 2009 based on approvals by mid-2008