Message: Re: CGX Energy to Present at COPIC Spring Energy Conference

Sully is going to release the 3D results on an ongoing basis as they receive the results of the interpitation.This should take us to July, And at that time,they hope to begin entertaining JVP inquires.Kerry also indicated that drilling could be in the summer of 2010,and if successful,production could be within 3 years or up to a possible 10 years.I was hoping that the drilling would take place in early 2010 as was indicated by CGX in the past. Oh well, patience required,I've waited 10 years,so another year or so I can handle.Buy on the dips if I have the $$.Cheers MF