Bayfield updates their drilling next to Rainy River-->July 2nd
posted on
Jul 02, 2010 01:11PM
81m @ 5.08 g/t Gold, 28m @ 13.28 g/t Gold, 9m @ 12.88 g/t Gold, 46.6m @ 2.28 g/t Gold plus Bonanza grade Silver (up to 1760 g/t)
Rainy River drill hole RR10-11 has been completed.
THE Drill hole RR10-12 is now being drilled at site of RR10-1 but at 60 degrees vs 45 degrees for RR10-1.
The hole will establish the down dip continuity of the gold mineralization hit in RR10-1.