Rubicon Minerals Corporation (TSX: RMX | OTCQX: RBYCF) ("Rubicon" or the "Company") provides an update of its 2017 Exploration Program at the Phoenix Gold Project with the remaining drill results from its planned 23,500-metre drill program and further observations.

Assay Results Highlights (as of December 14, 2017) representing approximately 4,592 metres ("m") of drilling:

Infill and step-out drilling program at the 610-, and 685-metre levels - with the objective of potentially upgrading and growing the 2016 Mineral Resources ("Mineral Resources")(not true widths, more details in the 'Qualified Persons and QA/QC' section below):

    --  610-17-23: 18.41 grams per tonne of gold ("g/t Au") over 2.5 m
        (including 31.14 g/t Au over 1.2 m)
    --  610-17-07: 12.81 g/t Au over 1.9 m (including 24.28 g/t Au over
        1.0 m)
    --  685-17-04B: 8.39 g/t Au over 2.8 m (including 16.89 g/t Au over
        1.0 m) and 9.21 g/t Au over 2.6 m (including 13.83 g/t Au over
        1.6 m)


2017 Exploration Program Update

The Company completed all of its originally planned 23,500 m of drilling and has received the remaining assay results from the outstanding 4,592 m of drilling (approximately 1,375 assays). The Rubicon team, together with Golder Associates Inc. ("Golder") and T. Maunula & Associates Consulting Inc. ("Maunula Associates"), is continuing to evaluate the data with the objective of updating the geological model for the F2 Gold Deposit at the Phoenix Gold Project. Due to being under budget and ahead of schedule, Rubicon has elected to drill an additional 5,000 m from the 610- and 685-metre levels before year-end and has completed 4,143 m from this drilling to-date.

The Company has advanced 41.5 m in exploratory underground development at the Phoenix Gold Project on the 122- and 244-metre levels into the mineralized envelope identified by Golder and the Rubicon team. Underground development will continue throughout the first half of 2018. Upon completion of the development, the Company will move into a test mining phase. Details of the 2018 test mining plans will be forthcoming in a future news release in early 2018. Rubicon remains on schedule to deliver an NI 43-101 Technical Report and updated Mineral Resource Estimate in the second half of 2018.

Golder is concluding test modelling to finalize the modelling methodology to be used for the 2018 Mineral Resource Estimate. The new methodology will incorporate stratigraphic controls based on correlations observed between the mineralization and stratigraphy, along with the controls for a variety of vein orientations as identified in the structural study. These enhancements will improve the representativeness of the geological model, but Golder is uncertain at this time what impact the re-interpretation will have on the Mineral Resource Estimate. In addition, Maunula Associates will continue to act as a third-party independent consultant who will conduct a peer review at key milestones throughout the exploration program.

Golder has completed numerous Qualified Person (QP) site visits at the Phoenix Gold Project and has concluded that the geological and analytical procedures put in place by Rubicon for the 2017 Exploration Program are consistent with standard industry practises and that the data is of sufficient quality to support the ongoing Mineral Resource modelling.

Structural Geology - Further Discrepancies Observed; Analysis Ongoing

Rubicon and its consultants are analyzing the structural observations and data to determine the relationship between the structures, the stratigraphy, and the gold mineralization at the F2 Gold Deposit. Based on observations and data from the detailed underground structural mapping and oriented core drilling program collected to-date, Golder is developing a working theory on the structural geology of the F2 Gold Deposit whereby the impact of some of the structural controls on gold mineralization were not as significant as interpreted in the previous structural model. However, further analysis is required (and ongoing) to develop a fulsome and substantiated interpretation on the key structural factors that control and contribute to the gold mineralization at the F2 Gold Deposit. The revised structural interpretation will serve to provide additional modelling constraints on the geometry and distribution of mineralized units and controls on mineralization within those units as pa rt of the updated F2 Gold Deposit geological model that is currently in progress.

Summary Assay Results and Diagrams

At the end of the news release, readers will find the following:

    --  Table 1: Summary of 2017 Drilling Assay Results, up to December
        14, 2017.
    --  Diagrams 1-4: Infill and step-out drilling at the 610-metre
        level, plan and section views.
    --  Diagrams 5-8: Infill and step-out drilling at the 685-metre
        level, plan and section views.


Please see our news releases on September 18, 2017 and November 16, 2017 for previously released assay results and diagrams from the 2017 Exploration Program.

Additional Observations up to December 14, 2017

The Rubicon team and its consultants have produced additional observations from the 2017 Exploration Program. Readers are cautioned that these observations could change as the Company advances its exploration activities. Rubicon believes there is inadequate information at this time to provide interpretations on an updated geological model and to update the Mineral Resources for the F2 Gold Deposit. The following is an additional observation:

    --  More high-grade gold intercepts encountered from flat-angled
        drilling at the 610- and 685-metre levels: Rubicon continues to
        encounter higher-grade gold intercepts at the deeper portions
        of the F2 Gold Deposit (from 488-metre level and below), as
        displayed in Diagrams 3, 4 and 6.


The Company intends to provide periodic updates as it completes the various elements and analysis of the exploration program.

CEO's Comments

Rubicon President and Chief Executive Officer George Ogilvie, P.Eng., stated, "Observations and data collected from the 2017 Exploration Program have enhanced our understanding of the F2 Gold Deposit. At this juncture, we have observed drill intercepts that are generally higher grades and wider horizontal widths compared to the 2016 Mineral Resource block model. Moreover, drill intercepts from deeper parts of the deposit are showing generally higher grades than the upper portions of the deposit, which support and enhance historical drilling results, whilst we continue to notice discrepancies compared to the previous lithological, mineralization, and structural interpretations."

"We are more than half way towards finalizing our structural interpretation and representative geological model, the result of which will allow us to deliver an updated Mineral Resource Estimate in the second half of 2018. We will provide more details on our 2018 Exploration Program, which includes plans for exploratory underground development, trial mining and additional infill drilling, early next year. At the same time, we intend to provide our 2018 budget following approval from our Board of Directors."

Qualified Persons and QA/QC

The content of this news release has been read and approved by George Ogilvie, P.Eng., President and CEO, and Mark Ross, B.Sc., P.Geo., Chief Mine Geologist, for Rubicon. Both are Qualified Persons as defined by NI 43-101.

Underground drilling was conducted by Boart Longyear Drilling of Haileybury, Ontario and was supervised by the Rubicon exploration team. All assays reported are uncut unless otherwise stated. All samples reported herein were performed by SGS Mineral Services of Red Lake, Ontario. All NQ core assays reported were obtained by fire assay with AA-finish or using gravimetric finish for values over 10.0 g/t Au.

Intercepts cited do not necessarily represent true widths, unless otherwise noted, however drilling is generally intersecting interpreted mineralized zones at a high angle. True width determinations are estimated at 65-80% of the core length intervals for the 305-metre level drilling, and estimated at 75-95% of the core length for the 610- and 685-metre level drilling. Rubicon's quality control checks include insertion of blanks, standards and duplicates to ensure laboratory accuracy and precision.

About Rubicon Minerals CorporationRubicon Minerals Corporation is an advanced gold exploration company that owns the Phoenix Gold Project, located in the prolific Red Lake gold district in northwestern Ontario, Canada. Additionally, Rubicon controls over 280 square kilometres of prime exploration ground in Red Lake and more than 900 square kilometres of mineral property interests in the emerging Long Canyon gold district that straddles the Nevada-Utah border in the United States. Rubicon's shares are listed on the Toronto Stock Exchange (RMX) and the OTCQX markets (RBYCF). For more information, please visit our website at www.rubiconminerals.com.

RUBICON MINERALS CORPORATION"George Ogilvie, P.Eng."President and CEO

Table 1: Summary of 2017 Drilling Assay Results, up to December 14, 2017

*Previously released assay results

               Drill hole                          Type                 Elevation     Total               From             To     Width           Grade
                                number                                                 Depth                (m)             (m)     (m)          (g/t Au)
                                                                                        (m)
    ---                                                                           ---                                                                      ---


    New results


    610-17-07                        infill/step-out      610-metre level                       462.0            351.7      353.6            1.9             12.81

                                                                                          including           352.6      353.6            1.0             24.28

                                                                                                              443.5      449.3            5.8              3.63


    610-17-22                        infill/step-out      610-metre level                       521.0            359.3      361.1            1.8              3.08

                                                                                                              432.2      432.9            0.8              3.44

                                                                                                              485.4      487.4            2.0              3.17

                                                                                                              512.2      514.0            1.9              4.75

                                                                                          including           512.2      513.0            0.9              9.48


    610-17-23                        infill/step-out      610-metre level                       525.0            443.9      445.0            1.1              3.20

                                                                                                              449.3      451.8            2.5             18.41

                                                                                          including           449.7      450.9            1.2             31.14


    610-17-24                        infill/step-out      610-metre level                       568.3 no significant assays


    685-17-03                        infill/step-out      685-metre level                       477.0            365.3      368.0            2.7              1.72


    685-17-04B                       infill/step-out      685-metre level                       405.0             85.2       88.0            2.8              8.39

                                                                                          including            85.2       86.2            1.0             16.89

                                                                                                              133.0      134.0            1.0             13.62

                                                                                                              147.0      148.0            1.0              5.32

                                                                                                              322.0      323.7            1.8              3.25

                                                                                                              358.5      361.1            2.6              9.21

                                                                                          including           358.5      360.0            1.6             13.83


    685-17-05                        infill/step-out      685-metre level                       399.0            128.0      129.0            1.0              2.99

                                                                                                              149.0      150.0            1.0              4.30

                                                                                                              198.0      199.0            1.0              8.77


    685-17-06                        infill/step-out      685-metre level                       402.0             90.0       91.4            1.3              1.79

                                                                                                              102.0      103.9            1.9              2.89

                                                                                                              318.6      322.0            3.4              2.72

                                                                                          including           319.0      320.1            1.1              5.38


    Previously released results


    *244-17-04                       structural           244-metre level                        99.0             28.4       39.4           11.1            115.19

                                                        including                              28.4             30.0        1.7         758.70

                                                        including                              37.4             39.4        2.0           7.76


    *244-17-05                       structural           244-metre level                        42.6             20.6       23.0            2.5              3.11

                                                                                               35.0             40.0        5.0           5.17

                                                        including                              38.0             40.0        2.0           7.00


    *244-17-06                       structural           244-metre level                        48.0              8.7       10.3            1.6             11.62

                                                                                               29.0             33.6        4.7           5.17

                                                        including                              29.0             30.9        1.9           7.40


    *244-17-07                       structural           244-metre level                        83.6             21.4       28.5            7.1              5.33

                                                        including                              26.7             28.5        1.8          14.17

                                                                                               48.5             49.5        1.0           3.82


    *305-17-01                       structural           305-metre level                       133.0             27.7       30.0            2.3             15.32

                                                        including                              27.7             29.2        1.5          23.40

                                                                                               60.6             63.3        2.7           3.95

                                                                                               70.4             73.4        3.0           4.43

                                                        including                              71.2             72.2        1.0           6.61


    *305-17-02                       structural           305-metre level                        72.0             36.6       38.0            1.4              5.29

                                                                                               44.3             45.6        1.3           5.18

                                                                                               57.9             59.4        1.5           7.80


    *305-17-03                       structural           305-metre level                        66.0             58.5       64.0            5.5              4.69

                                                                                          including            58.5       59.5            1.0              9.76


    *305-17-04                       structural           305-metre level                       125.7             55.0       59.5            4.5              3.62

                                                                                               78.5             80.0        1.5           4.74

                                                                                               91.0             93.5        2.5           3.69


    *305-17-05                       structural           305-metre level                        82.0             40.5       44.0            3.5              7.15

                                                        including                              42.3             44.0        1.7          12.70

                                                                                               57.0             58.5        1.5           4.64

                                                                                               63.0             65.0        2.0           3.27


    *305-17-06                       structural           305-metre level                        87.2             42.2       45.3            3.1              3.20

                                                                                               59.3             71.9       12.6           6.83

                                                        including                              59.3             61.0        1.7          29.70

                                                        including                              68.8             70.5        1.7          10.78


    *305-17-07                       structural           305-metre level                       146.1             40.0       42.0            2.0              3.32

                                                                                               61.1             66.0        4.9           4.27

                                                                                               89.7             93.4        3.7           3.62


    *305-17-08                       structural           305-metre level                       150.0 no significant assays


    *305-17-09                       structural           305-metre level                       108.4             44.0       51.4            7.4             58.22

                                                        including                              49.3             51.4        2.1         199.66

                                                                                               75.9             80.7        4.8           4.33


    *305-17-10                       structural           305-metre level                        69.4             64.8       68.4            3.6              7.75

                                                        Including                              66.6             68.4        1.8          13.58


    *305-17-11                       structural           305-metre level                       110.0            102.1      105.9            3.9              8.24

                                                        including                             102.1            103.6        1.6          19.83


    *305-17-12                       structural           305-metre level                       119.3             98.0       99.5            1.6              5.50


    *305-17-13                       structural           305-metre level                       184.0             46.1       47.2            1.1              4.75

                                                                                                               55.6       57.0            1.4              5.10


    *305-17-14                       infill/step-out      305-metre level                       303.0            118.4      127.0            8.6              8.09

                                                        including                             118.4            121.3        2.9          22.27

                                                                                              284.1            287.3        3.3           6.88

                                                        including                             284.1            286.0        2.0          11.17


    *305-17-15                       infill/step-out      305-metre level                       326.0            130.3      141.1           10.8              8.54

                                                        including                             130.3            131.8        1.5          21.90

                                                        including                             139.3            141.1        1.9          23.31

                                                                                              209.0            211.0        2.0           4.97

                                                        including                             210.0            211.0        1.0           9.36


    *305-17-16                       infill/step-out      305-metre level                       357.9            151.5      157.7            6.2              6.72

                                                        including                             151.5            153.3        1.8          16.38


    *305-17-17                       infill/step-out      305-metre level                       324.0            100.3      102.0            1.7              6.06


    *305-17-18                       infill/step-out      305-metre level                      331.05            282.6      292.5           10.0              6.13

                                                        including                             288.9            292.5        3.7           9.50


    *305-17-19                       infill/step-out      305-metre level                       360.0            215.8      220.5            4.7              7.78

                                                                                              231.6            236.0        4.4           4.69


    *305-17-20                       infill/step-out      305-metre level                       350.0            141.5      143.2            1.7              7.39

                                                                                              155.3            159.9        4.7          21.52

                                                        including                             155.3            156.8        1.5          44.02

                                                                                                              193.0      194.8            1.9              5.61


    *305-17-21                       infill/step-out      305-metre level                       475.0            111.0      111.5            0.5              4.88

                                                                                                              156.7      157.6            0.9              4.10

                                                                                                              183.0      186.6            3.6             11.06

                                                                                          including           185.0      186.6            1.6             20.80

                                                                                                              229.5      232.6            3.1             10.12

                                                                                          including           231.4      232.6            1.2             16.54

                                                                                                              236.5      237.2            0.7              6.16

                                                                                                              264.5      265.6            1.1              6.69

                                                                                                              268.6      268.8            0.3              9.78

                                                                                                              284.0      285.0            1.0              5.97

                                                                                                              351.4      351.8            0.4              4.87

                                                                                                              358.8      359.3            0.5              4.87


    *305-17-22                       infill/step-out      305-metre level                       442.0            212.3      221.0            8.7              9.78

                                                        including                             212.3            218.2        5.9          13.65

                                                                                              339.8            342.3        2.5           7.41

                                                                                              357.4            359.0        1.6           5.13


    *305-17-23                       infill/step-out      305-metre level                       501.0            213.0      221.0            8.0              1.20

                                                                                                              265.0      269.0            4.0              1.18

                                                                                                              278.5      278.9            0.4              8.25

                                                                                                              317.3      322.0            4.7              1.22


    *305-17-24                       infill/step-out      305-metre level                       329.0            177.6      178.2            0.6              3.05

                                                                                                              182.7      183.5            0.8              3.73

                                                                                                              192.5      194.2            1.7              4.58


    *305-17-25                       infill/step-out      305-metre level                       281.4 no significant assays


    *305-17-26                       infill/step-out      305-metre level                       138.7  no significant assays


    *305-17-27                       infill/step-out      305-metre level                       402.0            172.0      172.5            0.4              3.80

                                                                                                              206.3      207.6            1.3              3.95

                                                                                                              209.8      210.1            0.3              3.85

                                                                                                              397.4      398.7            1.3              1.48


    *305-17-28                       infill/step-out      305-metre level                       376.2            141.7      143.5            1.8              6.44

                                                                                          including           141.7      142.4            0.7             12.02

                                                                                                              187.5      189.0            1.5              3.13

                                                                                                              287.7      288.3            0.6              3.33


    *305-17-29                       infill/step-out      305-metre level                       300.0            109.4      110.4            1.0              4.74

                                                                                                              145.0      146.0            1.0              1.91

                                                                                                              190.0      196.0            6.0              5.24

                                                                                          including           190.0      192.0            2.0              7.82


    *305-17-30                       infill/step-out      305-metre level                       351.0            168.0      170.5            2.4              7.76

                                                                                          including           168.0      169.0            1.0             15.14

                                                                                                              177.0      178.2            1.2              3.36

                                                                                                              180.5      180.9            0.5              3.00

                                                                                                              223.5      225.0            1.6              8.05


    *305-17-31                       infill/step-out      305-metre level                       321.0            246.1      246.7            0.6              3.16

                                                                                                              292.5      293.7            1.3              5.37

                                                                                                              295.8      297.0            1.2              5.80


    *610-17-01                       infill/step-out      305-metre level                       547.3            447.0      451.0            4.0              6.70

                                                        Including                             448.4            450.0        1.7          15.14


    *610-17-02                       infill/step-out      610-metre level                       543.8            542.0      543.8            1.8              9.69


    *610-17-03                       infill/step-out      610-metre level                       540.0            465.7      467.6            2.0              4.69

                                                                                              496.4            498.4        2.0           3.28

                                                                                              507.7            509.2        1.5           6.60

                                                                                              535.0            537.5        2.5          10.90

                                                        including                             535.0            536.6        1.6          16.97


    *610-17-04                       infill/step-out      610-metre level                       512.0            434.5      440.0            5.5              9.75

                                                        including                             435.5            438.5        3.0          16.83


    *610-17-05                       infill/step-out      610-metre level                       496.0            366.5      368.0            1.5              5.39


    *610-17-06                       infill/step-out      610-metre level                       507.0            359.0      361.0            2.0              6.60

                                                                                              373.0            376.0        3.0           6.03

                                                        including                             374.4            376.0        1.6          11.42

                                                                                              442.0            448.5        6.5          12.89

                                                        including                             442.0            446.6        4.6          17.73


    *610-17-08                       infill/step-out      610-metre level                       424.0            406.5      415.8            9.3              5.21

                                                        including                             406.5            410.6        4.1           7.56


    *610-17-09                       infill/step-out      610-metre level                       404.5 no significant assays


    *610-17-10                       infill/step-out      610-metre level                       426.0            405.7      407.5            1.8             10.51

                                                                                                              415.6      418.5            2.9              5.80


    *610-17-11A                      infill/step-out      610-metre level                       446.7            315.0      317.0            2.0              5.38

                                                                                                              396.0      397.9            1.9              1.33


    *610-17-12                       infill/step-out      610-metre level                       414.5            310.0      311.0            1.0              3.40

                                                                                                              317.0      318.0            1.0              3.63

                                                                                                              383.7      384.3            0.6              7.94

                                                                                                              391.0      391.5            0.5              8.19


    *610-17-13                       infill/step-out      610-metre level                       435.0            306.7      307.3            0.6              6.52

                                                                                                              328.0      329.8            1.8              4.10

                                                                                                              338.0      340.0            2.0              3.42

                                                                                                              361.7      362.4            0.6              4.60


    *610-17-15                       infill/step-out      610-metre level                       418.5            393.0      395.0            2.0              7.30

                                                                                          including           394.0      395.0            1.0             13.78


    *610-17-18                       infill/step-out      610-metre level                       480.0            327.0      330.0            2.9              6.84

                                                                                          including           327.6      329.2            1.5             12.34

                                                                                                              336.2      337.7            1.6              5.04

                                                                                                              345.7      348.8            3.1             10.04

                                                                                          including           345.7      347.5            1.8             16.82

                                                                                                              449.4      452.0            2.6              9.24

                                                                                          including           450.9      452.0            1.1             11.51

                                                                                                              464.8      466.1            1.3              8.43


    *610-17-19                       infill/step-out      610-metre level                       477.0            333.0      336.0            3.0              7.64

                                                                                          including           335.0      336.0            1.0             21.99

                                                                                                              366.1      369.0            2.9              5.29

                                                                                          including           367.5      368.3            0.8             17.32

                                                                                                              440.3      448.0            7.7             14.30

                                                                                          including           443.2      448.0            4.8             21.43


    *610-17-20                       infill/step-out      610-metre level                       475.0            351.0      354.3            3.3              1.37

                                                                                                              450.7      451.4            0.7              3.73

                                                                                                              453.0      454.1            1.1              3.02


    *610-17-21                       infill/step-out      610-metre level                       499.0            329.5      331.0            1.5              4.60

                                                                                                              343.0      345.0            2.0              3.83

                                                                                                              485.5      486.5            1.0              5.75

                                                                                                              494.0      498.0            4.0              7.24


    *685-17-02                       infill/step-out      685-metre level                       378.0            322.0      324.7            2.7              6.62

                                                                                          including           323.2      324.7            1.5              8.91

                                                                                                              328.1      328.8            0.6              5.46

Cautionary Statement regarding Forward-Looking Statements and other Cautionary Notes

This news release contains statements that constitute "forward-looking statements" and "forward looking information" (collectively, "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "believes", "intends", "may", "will", "should", "plans", "anticipates", "potential", "expects", "estimates", "forecasts", "budget", "likely", "goal" and similar expressions or statements that certain actions, events or results may or may not be achieved or occur in the future. In some cases, forward-looking information may be stated in the present tense, such as in respect of current matters that may be continuing, or that may have a future impact or effect. Forward-looking statements reflect our current expectations and assumptions, and are subject to a number of known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements include, but are not limited to statements regarding the objectives of the exploration work currently being done at the Phoenix Gold Project, details of the planned exploration at the Phoenix Gold Project, the expected timing and details of exploratory underground development and potential test trial mining at the Phoenix Gold Project, the preliminary observations from the Company's 2017 Exploration Program and the details of Golder's modelling methodology for the 2018 Mineral Resource Estimate.

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management's best judgment based on facts and assumptions that management considers reasonable. If such opinions and estimates prove to be incorrect, actual and future results may be materially different than expressed in the forward-looking statements.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: possible variations in mineralization, grade or recovery or throughput rates; uncertainty of mineral resources, inability to realize exploration potential, mineral grades and mineral recovery estimates; actual results of current exploration activities; actual results of reclamation activities; uncertainty of future operations, delays in completion of exploration plans for any reason including insufficient capital, delays in permitting, and labour issues; conclusions of future economic or geological evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents a nd other risks of the mining industry; delays and other risks related to operations; timing and receipt of regulatory approvals; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the ability of Rubicon to comply with its obligations under material agreements including financing agreements; the availability of financing for proposed programs and working capital requirements on reasonable terms; the ability of third-party service providers to deliver services on reasonable terms and in a timely manner; risks associated with the ability to retain key executives and key operating personnel; cost of environmental expenditures and potential environmental liabilities; dissatisfaction or disputes with local communities or First Nations or Aboriginal Communities; failure of plant, equipment or processes to operate as anticipated; market conditions and general business, economic, competitive, political and social conditions; our ability to generate sufficie nt cash flow from operations or obtain adequate financing to fund our capital expenditures and working capital needs and meet our other obligations; the volatility of our stock price, and the ability of our common stock to remain listed and traded on the TSX.

Forward-looking statements contained herein are made as of the date of this news release and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. Readers are advised to carefully review and consider the risk factors identified in the Company's annual information form dated March 29, 2017 under the heading "Risk Factors" and in other continuous disclosure documents of the Company filed at www.sedar.com for a discussion of the factors that could cause Rubicon's actual results, performance and achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Readers are further cautioned that the foregoing list of assumptions and risk factors is not exhaustive and it is recommended that prospective investors consult the more complete disc ussion of Rubicon's business, financial condition and prospects that is included in this news release. The forward-looking statements contained herein are expressly qualified by this cautionary statement.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

SOURCE Rubicon Minerals Corporation

View original content with multimedia: http://www.newswire.ca/en/releases/archive/December2017/14/c6545.html

SOURCE: Rubicon Minerals Corporation

Allan Candelario, CFA, Director, Investor Relations and Corporate Development, Phone:
+1 (416) 766-2804, E-mail: ir@rubiconminerals.com, www.rubiconminerals.com; Rubicon
Minerals Corporation, Suite 830-121 King St. W., Toronto ON, CANADA  M5H 3T9
Share
New Message
Please login to post a reply